    A Method For Establishing Site Specific Coal Pillar Design Guidelines

    By Winton J. Gale

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,

    Jan 1, 1992

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014

  • SME-ICGCM
    The Utilisation of Numerical Modelling to Predict Water and Gas Flows Around Longwall Panels; Two Case Studies from the UK Coal Mining Industry

    By D. J. Reddish

    This paper illustrates how numerical modelling has been utilised to predict water and gas pathways around active longwall panels using two case studies. This information has proved invaluable m the de

    Jan 1, 2003

  • SME-ICGCM
    Evolution Characteristics of Pressure-Arch in Disturbed Overburden During Shallow Horizontal Coal Mining

    By Shuren Wang, Wenbing Guo, Paul C. Hagan, Yanhai Zhao

    "The overlying strata is often destroyed in large scale during shallow coal seam mining, and the sliding instability of the caved roof seriously threatens the safety of the mining field. The typical s

    Jan 1, 2018

  • SME-ICGCM
    Pillar Sizing

    By Marek J. Mrugala

    Coal strength based on scaled uniaxial compressive strength from the laboratory and back calculations from in-mine observations of pillar stability indicate that material strength scaling rules are op

    Jan 1, 1989

  • SME-ICGCM
    Changes In Seismic Measurements With Blast Induced Fracturing: A Field Experiment

    By Clifford J. Roblee

    In this paper, various seismic indicators are evaluated for ability to discern fractures induced into a rock mass by blasting. This is accomplished by presenting results from in situ crosshole seismic

    Jan 1, 1989

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    Comparison of Pillar Strengths Calculated Using Empirical Equations and Finite Elements

    By Aarao de Andrade Lima

    Mechanical properties typical of coal are used in the comparisons of pillar strengths based on finite elements and the empirical equations of Holland-Gaddy, Salamon-Munro, Obert¬Duvall, and Bieniawski

    Jan 1, 1997

  • SME-ICGCM
    Effect Of High-Extraction Coal Mining On Surface And Ground Waters

    By Francis S. Kendorski

    High-extraction mining of coal and other stratified minerals has a predictable effect on the surface and subsurface. Impacts on ground waters in overlying strata and on surface waters, that are associ

    Jan 1, 1993

  • SME-ICGCM
    Analysis And Field Testing Of Presupport Application In Coal Strata

    By J. D. Dizon

    Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat

    Jan 1, 1990

  • SME-ICGCM
    Influence Of The Sloping Of Ground Surfaces On Mine Subsidence (165d3ebb-e4c1-4bc8-a5e4-409b4e24155c)

    By D. M. Shu

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the sur

    Jan 1, 1992

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002

  • SME-ICGCM
    Application Of Bolt Design Criteria At Galatia Mine

    By Tom Denton

    The bolt design criteria, since it was first published by Dr. John Stankus (Stankus, 1997), has been recognized as an important tool in ground control design. This concept is based on the Optimum Beam

    Jan 1, 2000

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    Automation Of A Progressive Failure Procedure For Analysis Of Underground Mine Pillar Designs

    By N. P. Kripakov

    The U.S. Bureau of Mines (USBM) is conducting research to develop a practical computer-based tool that will allow coal mine planners to anticipate rock mass behavior surrounding mine entries prior to

    Jan 1, 1994

  • SME-ICGCM
    Streams and Longwall Coal Mining Subsidence: A Pennsylvania Perspective

    By Anthony T. Iannacchione

    Longwall mining produces surface subsidence basins that affect streams by water diminution and contamination. These effects can ultimately impair the biological character of the plants and animal comm

    Jan 1, 2011

  • SME-ICGCM
    Formation of Face Headings Using Stress Relief at Asfordby Mine

    By John Cassie

    The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la

    Jan 1, 1997

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    Systems Used In Coal Mining Development In Long Tendon Reinforcement

    By Brian Clifford

    A wide range of different cablebolt systems are available and in use in hard rock and coal mines around the world. The birdcaged cablebolt was initially used in UK coal mines in conjunction with ro

    Jan 1, 2001