Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies

    By John C. Stankus

    Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted

    Jan 1, 1990

  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • SME-ICGCM
    An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads

    By B. G. D. Smart

    An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou

    Jan 1, 1984

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    Influence Of Discontinuity Orientations And Strength On Cavability In A Confined Environment

    By L. J. Lorig

    Much of the present knowledge about caving behavior of rock masses has been obtained from empirical observations. Additional notions about caving have been developed through inferences derived from tw

    Jan 1, 1989

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    Monitoring of Mining Surface Deformation using Satellite InSAR and Precise GPS Techniques

    By Karsten Zimmermann

    Surface deformation monitoring is required all over the mining industry. For example oil and gas companies need this information to support exploration and production activities and to detect impacts

    Jan 1, 2008

  • SME-ICGCM
    The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs Division

    By Michael Amick

    Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa

    Jan 1, 1993

  • SME-ICGCM
    Coal Pillar Design Formulae Review and Analysis

    By Xinzhi Du

    Coal strength is essential to analyze the stability of excavation in coal. It is well known that the strength of coal tested in the laboratory is size-dependent, and different size specimens will prod

    Jan 1, 2008

  • SME-ICGCM
    A Troubleshooting Guide for Roof Support Systems

    By Raymond A. Mazzoni

    Over the last twenty years, roof support technology has made numerous advances since the original wedge and slotted bolts of the 1950's. By comparison, the roof supports used today are more compl

    Jan 1, 1997

  • SME-ICGCM
    Finite element analysis and comparison of shaly mine roof support systems

    By K. F. Unrug

    In the paper a numerical modeling method is used for evaluation of a roof support system, which is commonly used in the US coal industry. The effectiveness of mechanical roof bolting with or without,

    Jan 1, 1989

  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996