The Road To NPV+By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
Mineralogical Control Of Minerals Processing Circuit DesignBy M. A. W. Bryson
Platinum group metals are extracted almost exclusively in South Africa from three very different zones in the Bushveld Igneous Complex, called the Plat, Merensky, and the UG-2 reefs. The Plat reef is
Jan 1, 2004
-
A Lining Management System For Submerged Arc FurnacesBy Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert
What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st
Jan 1, 2007
-
The effect of resin annulus on anchorage performance of fully encapsulated rockboltsA diverse selection of rockbolt designs and resin anchors are available for use in underground mines. Research in recent years at the UNSW Mining Research Centre led to the construction of a rockbolt
Jan 1, 2003
-
Recovery of Copper from Reverberatory Copper Slag and Production of a Leach Residue used as a Portland Cement AdditiveBy T. A. Muhlare
"Large quantities of slag are produced every year and dumped on slag heaps around the world, posing a potential environmental threat due to contained heavy metals content. Slags are waste minerals pro
Jan 1, 2015
-
The Evolution Of Strategic Long-Term Planning At Anglo PlatinumBy D. C. Andersen, G. L. Smith, J. Pearson-Taylor
Following a restructuring of Anglo Platinum Limited in 2004 the strategic long-term planning function has been centralized. This paper describes the revised strategic long-term planning process coveri
Jan 1, 2006
-
Bord And Pillar Applications On The Platinum Mine: T-Cut Mining MethodBy C. C. Oosthuizen
Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th
Jan 1, 2005
-
A Case Study Of Risk Evaluation At Cerrejon MineBy Luis-Fernando Contreras, Juliano Maran, Richard LeSueur
A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res
Jan 1, 2006
-
Interpreting The Role Of Reagents In The Flotation Of Platinum-Bearing Merensky OresBy J. G. Wiese
Reagents are added to the flotation process of Merensky Reef ores to achieve specific functions that enable the separation of valuable minerals from gangue minerals on the basis of the difference in t
Jan 1, 2006
-
High-Wall Control At Anglo Gold Ashanti, Navachab Mine (2dbbeb3c-3655-4c5f-9dba-7c00ed466556)By André de Jager, Henk Ludik
Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blastin
Jan 1, 2006
-
Kuyasa Mining: South Africa?s First Black Owned And Managed Mining CompanyBy R. Scott
This article describes and evaluates the establishment of Kuyasa Mining including the search for a suitable deposit, the ongoing lack of finance, and market constraints. Despite the dramatic initial g
Jan 1, 1998
-
Microstructural, Mechanical, And Oxidation Property Evolution Of Gamma-TiAl Alloy With Addition Of Precious Metals ? SynopsisBy I. A. Mwamba
Titanium aluminide of composition Ti-47.5 at.% Al was prepared by melting titanium and aluminium of commercial purity with additions of precious metals of 0, 0.2, 1, 1.5 and 2 at.% content. The micros
Jan 1, 2012
-
From C.Z.O. To Zinc Cathode Without Any Pre-Treatment. The Ezinex ProcessBy M. Olper
The zinc recycling is assuming more and more importance. A lot of zinc secondaries and wastes are ready to be collected and converted to zinc metal. The impurities present in these materials and the t
Jan 1, 2008
-
Elasticity anisotropy in Oshima GraniteBy A. Golshani, M. Oda, K. Suzuki, T. Takemura
Anisotropic behaviours of OhshimaOshima granite were investigated by carrying out uniaxial compression tests, together with observations of microcracks under an optical microscope. The elastic modulus
Jan 1, 2003
-
The Corrosion Behaviour Of A Low Carbon Steel In Natural And Synthetic SeawatersThe corrosion behaviour of a low carbon steel was investigated in natural seawater and various synthetic seawaters. It was found that the steel corroded nearly four times faster in a 3.5% NaCl solutio
Jan 1, 2006
-
Hydraulic mining of an in situ heavy mineral ore reserveBy M. Berger
The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at
Jan 1, 2003
-
Threshold Blasting: The Renaissance Of Explosives In Narrow Reef Mining (3e858e14-2d39-4d00-94da-b26522958706)Threshold blasting involves the use of small amounts of high explosive to break and fragment hard rock without having to evacuate mining personnel. The method is easily assimilated and effective in ro
Jan 1, 2002
-
New Opportunities ? Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces (0496ee01-222b-4cf7-b688-79441e60e149)By M. Hopf
The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallurgical applications has become increasingly common. The high cooling efficiency of copper
Jan 1, 2006
-
The Human Cost Of Sub-Contracting/Outsourcing - IntroductionBy D. Pillay
Outsourcing? and ?sub-contracting? have become buzzwords in recent years, as SA industry becomes increasingly exposed to the global economy, and global competitiveness. In its effort to ?catch up? aft
Jan 1, 1999
-
Simulation of integrated underground mining-processingThe paper examines the design issues associated with the integration of mineral processing within underground mining systems. It demonstrates conceptual integrated system design options appropriate to