Combined Loading Tests On Large Diameter PilesBy A. Lyndon
Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t
Jan 1, 1989
-
Deep Foundation Shoring in South FloridaBy Douglas C. Brunot
Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w
Jan 1, 2018
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
Innovative Riverbank Erosion Control Retaining Wall System for the Brazos RiverBy Tracy Brettmann, Will Bohlen
An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban
Jan 1, 2018
-
In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?By Richard W. Hanford
The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an
Jan 1, 2001
-
Recycling Jet Grout Backflow: Waste Mitigation and Cost BenefitsBy Craig T. Jones, Zachary Q. Maassen
"Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting
Jan 1, 2017
-
Secant Pile Walls - Design, Construction And Case HistoryBy Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Coming To Times - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1995
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, CaliforniaBy Steve Thoman
After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic
Jan 1, 1996
-
Construction Considerations For Ground Modification Projects ? SynopsisBy J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile ConstructionBy Andrew L. Peterson
CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac
Jan 1, 1997
-
Urban Legends: Two Case Studies That Redefine "Impossible"By Grant R. J. Bearss
Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",
Jan 1, 2002
-
Design Of The BMIP Boat Section - IntroductionBy Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial SoilBy Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Stress And Deformation Of Pile Foundation Of Sutong BridgeBy Yin Zongze
The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter
Jan 1, 2006
-
Characterization Of Loess For Deep FoundationsBy Robert L. Parsons
This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet
Jan 1, 2009
-
Analyzing Drivability Of Open Ended Piles In Very Dense SandsBy James A. Schneider
The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu
Jan 1, 2010