Stability Analysis Of Micro Pile Reinforced Idukki Soil SlopesBy Anjana C. P, K. Ranga Swamy
The hilly regions of Kerala are severely affected by excess rainfall, causing tremendous damage due to landslides and slope failures. It is necessary to strengthen the existing slope profiles to preve
Sep 1, 2022
-
Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing FacilityBy Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler
"This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in
Jan 1, 2015
-
Allowable Compressive Design Stresses For Pressure-Treated Round Timber Foundation Piling - Presented Before The American Wood-Preservers' Association Reno, Nevada, May 1985By James S. Graham
Research at the University of Colorado on southern pine and Douglas-fir piling has determined that the existing building code design stress values of 1200 psi and 1250 psi, as determined by ASTM D-289
Jan 1, 1986
-
Low Overhead Secant Piles Drilled From Within A ShaftBy Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst
Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power
Oct 1, 2022
-
Design Considerations For Laterally Loaded Free-Head Rigid Piles In Engineering PracticeBy O. Craciun, C. A. Bridges, M. Cai, J. Sugawara
There are a number of methods that can be adopted for predicting the ultimate lateral resistance of a free-head rigid pile, from the conventional Brinch Hansen and Broms solutions to three-dimensional
Nov 1, 2022
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of MexicoBy Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Non-destructive Testing Of Unknown Bridge Foundation Lengths Using Parallel Seismic TestingBy Chetan D. Savani, Mike K. Muchard
The necessity to evaluate undocumented foundation lengths is essential in assessing the useable life, need for scour protection, retrofitting, or full reuse of existing bridge foundations. For this pu
-
Deep Mixing for Levee Repair at Hurricane Protection Project, P-17A, Louisiana, USABy Peter Cali, David Yang, Rakshya Shrestha, Ralph Griffin, Sushil Kafle, Motoji Watanabe
"As a part of the ‘US Army Corps of Engineers - New Orleans to Venice, Louisiana Hurricane Protection Project’, deep mixing ground improvement was designed to reinforce the soft ground for the emergen
Jan 1, 2015
-
Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)By Alper Turan, Hesham El Naggar
"The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule
Jan 1, 2017
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Steel H-Piles For A 11.7-Mile Long Rail Rapid Transit ProjectBy Jeongbok Seo
The Dulles Corridor Metrorail Project (DCMP) involves the design and construction of a 23.1-mile extension of the Washington Metropolitan Area Transit Authority (WMATA) rail system. The initial 11.7-m
Jan 1, 2010
-
Pile Design And Construction Challenges In Partially Thawed Alaskan SoilsBy John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas
-
Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)By John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask
Jan 1, 2017
-
Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage BarrierBy A. David Miller, Douglas M. Barber
"The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust
Jan 1, 2015
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.By Theo. A. M. Salet
The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a
Jan 1, 2006
-
Sharing of Lateral Loads and Moments in Pile FoundationsBy Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi
"In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile
Jan 1, 2005
-
Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale EffectsBy Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami
"Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha
Jan 1, 2015
-
Cost and Technical Comparison of Non-Destructive Test Methods for Drilled ShaftsBy Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt
Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented
Jan 1, 2019
-
The Use of Shape Accel Arrays (SAAS) for Measuring Retaining Wall DeflectionBy Paul Thurlow, Richard K. Lipscombe
The measurement of deflection of designed diaphragm walls is critical for near real time information to assess wall and soil behaviour as the internal area is excavated in a controlled manner. Data en
Jan 1, 2017