Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case HistoryBy Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
The Settlements Of Buildings On Pile FoundationsBy Mait Mets
In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th
Jan 1, 2002
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Lateral Pile Load Testing Under Cyclic LoadsBy Dan Brown
This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed
Jan 1, 2003
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil MovementsBy L. F. Miao
Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular
Jan 1, 2008
-
Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - SummaryBy William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
Soil Profiles Along The Alignment Of The I-880 Replacement ProjectBy Mark A. Willian
The purpose of this short paper is to present soil profiles and basic soils information for the portion of the I-880 Replacement Project alignment where highway structures are to be built. The informa
Jan 1, 1996
-
Comparison Of Static Load Test And Dynamic Pile Testing ResultsBy Patrick J. Hannigan
A comparison of 40 statically and dynamically load tested piles was performed to evaluate the variation between testing methods. This evaluation indicated an agreement of 10% to 15% could be obtained
Jan 1, 1987
-
Application Study On Non-Destructive Static Test PileBy Han Xuanjiang
Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen
Jan 1, 1991
-
Developments For Mitigating Measures From Deep Shafts Of North/South-Line AmsterdamBy Klaus Pöllath
This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions
Jan 1, 2006
-
Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and LimitsBy Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw
Jan 1, 2016
-
Modelling For Consolidation Around The Pile TipBy Emöke Imre
A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical
Jan 1, 2002
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Special Foundation Construction For Large Deep Excavation Pits In Berlin - Summary:By Wolfgang G. Brunner
The center of Berlin is currently a huge jobsite, where international architects, designers, consultants, construction and ground engineers as well as investors take on the challenge of the biggest an
Jan 1, 1999
-
The Challenges Of Construction In Karstic Limestone: Three Major Case HistoriesBy Donald A. Bruce
The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si
Jan 1, 2002
-
Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular PilesBy Koichi Kobayashi
Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora
Jan 1, 2006
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - IntroductionBy Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014