Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
Comparison of Pile Foundations and Ground Improvement for Reduction of Seismic Displacements for a Wastewater Treatment PlantBy Andrew Port, Ali Ghandeharioon
Nonlinear seismic deformation analyses using the finite difference program FLAC were performed for a wastewater treatment plant to estimate foundation displacement and performance of two proposed tric
Jan 1, 2018
-
The Effect of Arching Pressure on a Vertical Circular WallBy Sangseom Jeong, Kyoungyul Kim, Jaeyeon Cho
"Abstract The lateral earth pressure of vertical circular shaft is investigated by using experimental tests and a theoretical analysis. The emphasis was quantifying on the magnitude and distribution o
Jan 1, 2014
-
Deep Foundations In Hong Kong - SynopsisBy Martin Pratt
This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr
Jan 1, 2000
-
Construction Of Pile Foundation For Railway ViaductsBy M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Variable Inertia Elastic Piles On Elastic Plastic Soils Bearing Horizontal Forces: A Numerical Calculation Method Applied To Two Examples Of StructuresBy G. Noce
The ever more present necessity for greater precision in foundation structures on vertical piles subject to horizontal forces applied to the heads, in the light of of the latest knowledge about the el
Jan 1, 1989
-
Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil MixingBy Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden
Jan 1, 2014
-
Keynote Lecture: Axial Design And Lateral Design - Deep FoundationsBy Mike Neill, O&apos
? Bypass soft soils near the surface ? Resist uplift loads ? Resist lateral loads ? Bypass scourable soils ? Bypass liquefyable soils ? Mitigate movement of expansive or frozen soils ? "Tu
Jan 1, 1998
-
Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. ApplicationsBy William S. Heckman
a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and
Jan 1, 1997
-
Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DCBy Joseph C. Gillen
This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d
Jan 1, 2006
-
Jetting-Assisted Sheet Pile DrivingBy Marie-Pierre Bourdouxhe-Barnich
Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d
Jan 1, 2002
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? BackgroundBy Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987
-
Deep Mixing Technologies for Lateral Support SystemsBy W. Sondermann
"AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t
Jan 1, 2014
-
Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In MarlBy Gregory J. Canivan
Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and
Jan 1, 2002
-
Effects of Deep Mixing Method to Reinforce Earth Levees in the Mekong Delta, VietnamBy Bao K. Le, Khang T. Truong, Masaki Kitazume, Toru Kobayshi, Long P. Le, Tanaka Hitoshi, Makoto Kamimura, Hoang-Hung Tran-Nguyen
"Earth levees constructed using dredged materials taken from a river along an earth levee have annually damaged in the Mekong Delta due to high void spacing in earth levees and floodwater. Sliding and
Jan 1, 2015
-
Overcoming Grouting Difficulties During Retaining Wall StabilizationBy Jared M. Green
This paper presents the wall stabilization design and implementation for a 541 linear ft masonry and concrete gravity-type retaining wall flanking the west perimeter of a 7.37 acre parcel in Bronx, Ne
Jan 1, 2011
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Cofferdam Failures ? IntroductionBy Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987