Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Plastic Piling

    By Magued G. Iskander

    The deterioration of concrete, steel, and timber is a serious hindrance to construction in marine and corrosive environments. Composite materials such as fiber-reinforced polymers (FRP) can offer perf

    Jan 1, 2002

  • DFI
    Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay Bridge

    By W. Robert Thompson

    Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc

    Jan 1, 2009

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • DFI
    Dynamic Stability Of An Axially Loaded Pile

    By S. S. Gajin

    The paper deals with parametric vibrations of an axially loaded pile. The dynamic model is derived by means of Hamilton's principle and reduced to a partial differen­tial equation with variable c

    Jan 1, 1989

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles

    By Sridhar Krishnan

    This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p

    Jan 1, 2006

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Are Specifications for Deep Foundation Concrete Up-To-Date?

    By Karsten Beckhaus

    "Abstract Tremie concrete for special geotechnical works needs special properties, especially during the casting process. Today’s execution standards for bored piles and diaphragm walls, EN 1536 and E

    Jan 1, 2014

  • DFI
    Excavation Support At The Capitol Visitor Center In Washington DC

    By Harald Ludwig

    In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site

    Jan 1, 2006

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • DFI
    Safe Execution Of Special Foundation Works Analysis - Concept - Implementation

    By Walter Ensinger

    Special foundation works is one of the most innovative sectors in civil engineering and construction. Both engineering techniques and construction machinery are undergoing continu­ous further developm

    Jan 1, 2002

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • DFI
    A Case History Studying On Displacement Controlling In Deep Excavation

    By Feng Yongxuan

    Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me

    Jan 1, 1991

  • DFI
    A Tale of Two Dams: Performance of Deep Cutoff Walls

    By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders

    "This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv

    Jan 1, 2017

  • DFI
    Float-In Cofferdams

    By Robert B. Bittner

    Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned

    Jan 1, 2013

  • DFI
    Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980

    By William J. Rothschild

    Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers

    Jan 1, 1984

  • DFI
    Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, Washington

    By David G. Winter

    The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t

    Jan 1, 1990