Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f
Jan 1, 2013
-
Seismoacoustic Effects Of Driving Large Diameter Piles ? SummaryBy Barry C. Roth
Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground
Jan 1, 2001
-
Design And Analysis Of Cooling Tower Pile FoundationsBy Michael W. Oakland
This paper summarizes the analysis and design of a pile foundation system for two 400 ft. diameter, 500 ft. high cooling tower using a detailed finite element analysis package. The cooling towers are
Jan 1, 2010
-
Pile Installation Recorder Tests For ACIP/CFA Piles - IntroductionBy Garland Likins
The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t
Jan 1, 1998
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing MethodsBy Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted PilesBy David T. Farber
"Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste
Jan 1, 2005