Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental ConsiderationsBy Takashi Enomoto
"The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja
Jan 1, 2015
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
Guidelines For Selection Of Parameters For Design Of Caisson Foundations For Certain Conditions. - SynopsisBy Dinesh R. Katti
Caissons which are locally known as well foundations, which may very in diameter from 30 m to more than 30 m and in majority of the cases having depth to diameter ratio between 1 to 1.5, are normally
Jan 1, 1996
-
Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff ClaysBy Alexander Scheuermann, Martin D. Larisch, David J. Williams
"Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den
Jan 1, 1900
-
Comparison of 2D and 3D Anchor Analysis MethodologiesBy Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu
The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on
Jan 1, 2019
-
Ultimate Lateral Load of a Pile in Cohesive Soil under Static LoadingBy Dileej M. Dewaikar, Poonam A. Patil
"In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met
Jan 1, 2005
-
Slurry Trench Design and Construction in Difficult ConditionsBy Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
The Stiffening Effect of a Caliche Layer on Pile FoundationsBy Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian
"Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la
Jan 1, 2015
-
New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and LogisticsBy Max Gwynn, Tony Suckling
"The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.
Jan 1, 2008
-
Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)By Frank Rausche
The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender
Jan 1, 2001
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket DesignBy S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
A New Low-Cost Bi-Directional Load Test Technique for Drilled ShaftsBy Sherif Elfass, Gary Norris
Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s
Sep 8, 2021
-
Settlement Control Of A Road Embankment Using Vertical DrainsBy Wei Tu
A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that
Jan 1, 2009
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Hammer-Grout Piles At The Bronx-Whitestone BridgeBy Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case StudyBy Balasubramani M., Ramana P. V., Bairagi K.
This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the