    Preliminary Assessment of Reliability and Sampling Requirements for Deep Mixing Method (DMM) Foundations for LNG Processing Facility and Storage Tank (52fd79c3-58e2-4970-9b21-5f8e12930105)

    By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Attasit Korchaiyapruk, Edward C. Clukey

    "A deep mixing method (DMM) foundation was selected by the Project Team for a very large LNG facility in West Africa. As described in a companion paper, this foundation consists of a large number of c

    Jan 1, 2017

  • DFI
    Mixed-in-Place Cut-Off Walls Create Artificial Polders in the Netherlands

    By R. Gerritsen, Erwin de Jong, E. van der Velde, C. te Boekhorst

    "In recent years the market for Mixed-In-Place soil mix techniques in the Netherlands has been growing rapidly. Initially the technique was used to create cut-off walls near river dikes and as a vibra

    Jan 1, 2015

  • DFI
    Effect of Sand Density on Load Sharing Mechanism of Piled Raft Foundation

    By Rouzbeh Vakili, Adel M. Hanna

    "The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und

    Jan 1, 2017

  • DFI
    Session 8 " Jet Grouting and Deep Mixing"

    By Masaki Kitazume

    Five papers were presented orally to the topics of Jet Grouting and Deep Mixing. The session was started with a brief introduction by the moderators. Following the oral presentation, floor discussions

    Feb 10, 2003

  • DFI
    Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) Method

    By Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida

    "Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below

    Jan 1, 2015

  • DFI
    Session 23 "Grout in Rock and Mining"

    By John Davie

    We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is

    Feb 10, 2003

  • DFI
    Effect of Free Standing Height on Rock Socketed Pile under Lateral Load

    By Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan

    "Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o

    Jan 1, 2015

  • DFI
    Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck Bridge

    By Timothy C. Siegel, Paul J. Axtell

    The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.

    Jan 1, 2017

  • DFI
    Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, Missouri

    By Adrian M. Keller

    Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer

    Jan 1, 2010

  • DFI
    Special Aspects of Constructions with Deep Mixing Systems for Infrastructures

    By Alexandra Weidle, Seffen Leppla, Rolf Katzenbach, Matthias Seip

    "A lot of different deep mixing systems have been developed in the last decades for a wide spectrum of applications, e.g. retaining and foundations systems, soil improvement, sealing of toxic substanc

    Jan 1, 2015

  • DFI
    Session 14 "Deep Mixing Method III"

    By Stefan Dahlin

    The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation

    Feb 10, 2003

  • DFI
    Preliminary Assessment Of Reliability And Sampling Requirements For Deep Mixing Method (Dmm) Foundations For Lng Processing Facility And Storage Tank

    By Edward C. Clukey

    A deep mixing method (DMM) foundation was selected by the Project Team for a very largeLNG facility in West Africa. As described in a companion paper, this foundation consists of alarge number of colu

  • DFI
    Session 18 "Grouting for Micropiles & Anchors"

    By Jim Bruce

    No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc

    Feb 10, 2003

  • DFI
    Session 29 "Grouting for Tunnels 1"

    By Lynn Crayne

    We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the

    Feb 10, 2003

  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • DFI
    Lateral Load Tests on Step Tapered Bored Piles in Calcareous Sands

    By Nabil F. Ismael, Mohamed El Deeb

    "The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed

    Jan 1, 2005

  • DFI
    Surprises And Solutions When Driving Piles In Mountain Valleys Of Vermont

    By John E. Lens

    Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta

    Jan 1, 2007

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Design and Quality Control of Soil Mix Walls for Earth and Water Retaining Structures

    By Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock

    "In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to

    Jan 1, 2015