Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Desulphurizing ISF feed by roasting

    By Wright S

    The feed to the Cockle Creek Imperial Smelting Furnace consists of mixed Pb/Zn con- centrates and lead sulphate-containing elec- trolytic zinc plant residues. Roasting was investigated as a means of

    Jan 1, 1986

  • AUSIMM
    Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central Queensland

    By T Laurencont

    The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham

    Jan 1, 2003

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018

  • AUSIMM
    The Benefits of Mine Scale Three-Dimensional Structural Modelling at Macraes Mine, Central Otago – A Case Study

    By A J. Daniels

    Macraes Mine is a large-scale open-cut and underground gold mine located in Central Otago, on the South Island of New Zealand. This paper presents the role of geological mapping in the grade control p

    Aug 22, 2011

  • AUSIMM
    The Geita and Kukuluma Mineralised Trends, Lake Victoria Goldfield, Tanzania ù Orebody Characteristics and Project Planning

    By M Skead, H Michael, R Chase, A Davidson

    Ashanti Goldfields CompanyÆs (AshantiÆs) most recent development is the Geita Project in the Lake Victoria Goldfield of NW Tanzania. It comprises six distinct gold deposits within two mineralised tren

    Jan 1, 2000

  • AUSIMM
    Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

    By H Kurth

    Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine

    Mar 22, 2022

  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Dry versus Wet Magnetic Separation – Horses for Courses

    By J Elder

    Magnetic separation equipment has long been used to upgrade and beneficiate a wide variety of minerals and materials. Over the years, significant advances in both wet and dry magnetic separators have

    Oct 5, 2011

  • AUSIMM
    Copper Smelting in South Australia The First Fifty Years

    By Drew GJ

    Smelting is a process in which heat is applied to ores to produce metals. Impurities are removed by segregation in the slag, or converted to gases or sublimates and discharged up the flues. Mate- r

    Jan 1, 1987

  • AUSIMM
    Slab-Buckle Failure in Weak Coal Mine Strata - The Malvern Hills Case Study of July 2004

    By D H. Bell

    Slab-buckle failures in coal sequences involve thin slab deformation in strata dipping parallel to the footwall, and are a consequence of both unloading and the weak nature of the thinly bedded rock m

    Jan 1, 2007

  • AUSIMM
    How Robust Are Your Asset Integrity Management Processes?

    By R Cannings, J Wallace, M McCamley

    The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per

    Jun 22, 2016

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018

  • AUSIMM
    Monitoring as an input to support and sequence design

    By C Hall, K Williams, B Keogh, S Wong

    Cannington mine is a silver lead zinc operation located in north west Queensland. The operation has been in production since 1997. Ore is primarily moved through an underground material handling syste

    Nov 30, 2018

  • AUSIMM
    The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical Simulation

    By Q Yu, G Ren, Z-Y Chen, J Yang

    The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole

    Aug 24, 2015

  • AUSIMM
    Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide Deposit

    By R Knight

    The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos

    Sep 5, 2011

  • AUSIMM
    In-Pit Crushing and Conveying Bench Operations

    By T Atchison

    In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v

    Jul 11, 2011

  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • AUSIMM
    Improvement of the copper flash smelting furnace (FSF) and the slag cleaning furnace (SCF) process by advice-based control of silica and coke addition

    By A Specht, A Müller, V Montenegro, S Winkler, E Klaffenbach, A Schmidt

    In the process of primary copper smelting in flash smelting furnace (FSF), the ratio of iron to silica (Fe/SiO2 mass ratio) primarily determines the slag viscosity and magnetite formation. Viscous sla

    Aug 21, 2024