Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008

  • AUSIMM
    Brazil - Gold - 2000

    By Subrahmanyam T. V, Rao V. D

    GOLD, the most important and highly coveted valuable metal, is being sought and exploited in almost all the geological environ- ments by the developed, developing and underdeveloped coun- tries of th

    Jan 1, 1988

  • AUSIMM
    Mineral Resource Classification - It's Time to Shoot the 'Spotted Dog'!

    By P T. Stoker, A Allman, D P. Carville

    Classification of mineral resource estimates is one of the most important responsibilities of the Competent Person. In recent years, classification decisions have been driven more by the detailed bloc

    Jan 1, 2006

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • AUSIMM
    Geotechnical assessment for the waste rock backfilling of the decommissioned Rum Jungle Open Cut Pit

    By J Hartnett, B Tarrant, A Rayner, D O’Toole, P Davies

    Since 2009, the Northern Territory and Australian governments have been working under a national partnership arrangement to inform a rehabilitation plan for the former Rum Jungle uranium mine. Part of

    Jul 1, 2021

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    Impact of hydrophobic particles on the classification of flotation frothers

    By G Bournival, Y Saavedra Moreno, S Ata

    Flotation frothers are heteropolar molecules that are preferentially adsorbed at the bubble interface to enhance the flotation performance by promoting the formation of small and stable bubbles. Froth

    Aug 24, 2022

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback Operations

    Conditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I

    Jan 1, 2005

  • AUSIMM
    Advancements in Condition Monitoring on Mill Drive Trains for Proactive Maintenance and Early Fault Detection Purposes

    By T Roesch, M Neurohr, S Stratton

    "Dwindling commodity prices are forcing today’s mining operations to increase output. Sometimes the solution is to upgrade the existing infrastructure; however, in most cases it has to be achieved wit

    Oct 10, 2016

  • AUSIMM
    The Pre-Feasibility Study – Big Choices, Little Time

    By D J. Logan, J Jackson

    "As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin

    Mar 8, 2016

  • AUSIMM
    Bulk Mining Explosives ù Technical Tool or Commercial Commodity?

    By G Le Juge, K Waldock

    The current suite of bulk mining explosives has been available to the industry for over 20 years. The flexibility and performance of ammonium nitrate based emulsion blend explosives were accepted by t

    Jan 1, 2004

  • AUSIMM
    Evaluation of Exploration Projects

    It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment

    Jan 1, 2007

  • AUSIMM
    Working in Metallurgy Research

    When studying minerals degrees at university, all the emphasis is towards sending the graduates into the bush to work at a remote mine; however, that is not the only option available to new graduates.

    Jan 1, 2006

  • AUSIMM
    Setting Best Practice: FIFO at the Mount Keith Concentrator

    By S O. Hille

    Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc

    Jan 1, 2002

  • AUSIMM
    Removal of Phosphorous from Australian Iron Ores

    By C I. Edwards

    Phosphorous is typically present in iron ore either in the mineral apatite, Ca5(PO4)3OH, or associated with the goethitic fraction of the ore. In this paper, we present results that show that phosphor

    Jul 11, 2011

  • AUSIMM
    Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, Washington

    By L Galisson, E Audigé, D Sowers

    Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington

    Sep 17, 2014

  • AUSIMM
    The Value of Consulting with the Community

    By M L. van Kampen

    The recent (2005) amendments to the Resource Management Act 1991 have made it clear that there is no obligation on an applicant to consult. However the importance and value in consulting with the comm

    Jan 1, 2006