Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Monitoring of Erosion Risk in Surface Mining Area using a Satellite Image and Geographic Information System – A Case Study in the Indonesia Coal Mining AreaBy S Maryati
Surface mining activities disturb large areas, produce great sediment loads and tend to be a source of water pollution if they are not managed properly. Coal mining in Indonesia has a very high risk o
Nov 22, 2011
-
Improvements in estimating strengths of loose tailings: results from the TAILLIQ research projectBy D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell
This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi
Jul 1, 2021
-
Rehabilitation of Alluvial Gold and Open-Cast Coal Mines û 1904 to 2004By M Pizey, C Ross
Rehabilitation approaches, methods and outcomes have changed markedly over the last 100 years, and especially over the last 20 years. Alluvial gold dredges have moved from creating a legacy of boulder
Jan 1, 2004
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, VictoriaBy D J. Clark, R F. Wright, M D. Goodz
The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8
Jan 1, 2009
-
Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil DumpBy R Van Laeren, G Langerak, S Fityus, K Koosmen
Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal
Jul 27, 2015
-
Productivity improvement through collaborative shift planning and trackingBy E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
Managing Geological Complexity - Beta Hunt Mine, Kambalda, Western AustraliaBy K P. Crameri
The Beta Hunt orebody is situated on the south western limb of the Kambalda dome. It is one of the nickel occurrences in the area which fall into the category of æKambalda Style OrebodiesÆ. These oreb
Jan 1, 2006
-
Staurolite Product DevelopmentBy S Benson
Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is
Jan 1, 2001
-
Some considerations on rock slope stability issues in Afghanistan with an emphasis on Kandahar RegionBy A B. Jahed, Ö Aydan, T Ito
In this study, the authors compiled some case history data and present some typical examples of rock slope stability issues in Afghanistan with a special emphasis on Kandahar region and categorise roc
Nov 29, 2022
-
Integrating Blastholes into Exploration Data to Improve Coal Recovery and ModellingBy H Stedman
Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c
Aug 18, 2014
-
Utilising Electronic Detonators at Hail Creek Mine for ‘Dynamic Buffering’By A Baker
Hail Creek Mine is an open cut coal operation owned by Rio Tinto. It is located 120 km south west of Mackay in the Bowen Basin region of central Queensland. Opened in late 2003, the mine produces two
Nov 8, 2011
-
Laboratory Studies in Comminution: Part IV Effect of Feed Sizing on the Grinding of a Tin OreBy K B. Quast
Changes in feed size distribution can have significant effects in rod mill grinding. The product sizing resulting from wet batch milling of a tin ore showed little influence on fines production after
Jan 1, 1998
-
The Intec Copper Process: A Detailed Environmental AnalysisBy N J. Welham
The Intec Copper Process is an environmentally advantageous hydrometallurgical process for the production of high purity copper and associated precious metals from copper sulphide concentrates. The pr
Jan 1, 2002
-
Successful Geostatistical Approach for a Nickel Ore Deposit – A Case Study for Nickel Laterite Deposit in Central I Pit, Kabaena Nickel Mine, Kabaena Island, Southeast Sulawesi, IndonesiaBy V Yadi
Geostatistics has been widely used for more than four decades as a powerful tool in ore resource/reserve estimates and grade control. This method has gradually replaced the conventional method such as
Aug 22, 2011
-
Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific ConditionsBy J Pearce, M Barteaux, S Pearce
The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the
Jul 27, 2015
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zonesBy J G. McLellan, B Miller
Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio
Sep 20, 2017
-
Starter dyke optimisation with Muk3D and GoldSimBy C A. Cooper, G A. Suter
The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai
Jul 23, 2018
-
The coalmine roof rating – an update in its calculation and mechanistically why it worksBy M Colwell
The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g
Nov 29, 2022