Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, AustraliaBy T J. Sullivan, H Pinkster, G Swarbrick
From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o
Nov 5, 2014
-
Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production SchedulingBy P Cesare, S Munro, D Wandel, R A. Bearman
Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t
Nov 24, 2014
-
Improved Trigger Action Response Plan Development Based Upon Mine-specific DataBy D Cliff, B Belle
Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a
Aug 31, 2015
-
Subtek™ 4D™ – Optimised blasting performance through the application of new underground bulk explosive technologyBy B Taylor, S Evans
Bulk explosive technology for underground mining has not seen any significant technological advances since the widespread transition from ammonium nitrate fuel oil (ANFO) to ammonium nitrate emulsions
Sep 1, 2024
-
Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?By C Pope, M Tannock
Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m
Jul 13, 2015
-
L & M Mining Limited - Twenty Years of Alluvial GoldLime and Marble Limited was founded by the late T J McKee OBE and his family in 1935. The Company had its base in the high grade marble deposits on Takaka Hill, and was also shipping crushed limestone
Jan 1, 1998
-
Network Optimisation of Underground Mine DesignBy D H. Lee, J F, J H. Rubinstein
This paper examines the problem of optimising the life-of-mine costs of an underground mine, focussing particularly on the costs associated with the underground development needed to provide access t
Jan 1, 2000
-
Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel MineBy J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Application of a reinforcement learning AI solution for optimisation of screening shuttles controlBy A Horeth, E Duggan, B Versiani, A Gooch
Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati
Nov 8, 2021
-
Recognising the Mineral Resource Potential of New Zealand - A Regional InitiativeBy R N. Robson, A B. Christie, I J. Graham
Strategy development by the minerals industry identified the fragmented management of mineral resources as a significant impediment to the discovery and development of
Jan 1, 2006
-
Comparison of Glass-fibre Reinforced Polymer Rock Bolts with Double Corrosion Protection Steel Rock Bolts for Use in Tunnel ApplicationsBy S J. Clarke, G Sieders
Double corrosion protection (DCP) rock bolts have evolved to become complicated assemblies comprising numerous components. This complexity is mainly associated with durability considerations including
Sep 17, 2014
-
New Perspectives on the Busang Gold FraudThe gold salting fraud at Busang on the island of Kalimantan, Indonesia was exposed in early 1997 and resulted from the independent drilling, sampling and assaying of PT Freeport Indonesia which repor
Jan 1, 2002
-
Atlas of Petroleum and Mineral Resources Maps with Monograph of Late Jurassic Quaternary Sediments of the WorldBy E N. Isaev, L E. Levin
New data on the geology of the Late Jurassic to Holocene sediments cover of the World and associated mineral resources (oil, gas, ferromanganese nodules, ores of massive sulphides and other metals) ha
Jan 1, 1995
-
Relating Textural Attributes to Mineral Processing - Developing a More Effective Approach for the Cadia East Cu-Au Porphyry DepositBy R Berry, S G. Walters, J A. Hunt, D Collett
The texture of an ore type is fundamental in understanding the metallurgical behaviour of an ore. This study will show examples of how quantified textural attributes (mineral shape, grain size and min
Jan 1, 2008
-
The development of DRI pellets for green steelmakingBy C R. Ure
To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r
Sep 18, 2023
-
Planning of Open Cut MiningThe increased cost of imported oil fuels, coupled with our understandable reluctance to commit ourselves to the use of nuclear energy, has resulted in a renewed reliance on coal as a primary source of
Jan 1, 1976
-
Performance and Acceptance Testing of Main Mine Ventilation FansBy D J. Brake
In most underground mines, the ventilation system is a significant portion of the total mine capital and operating cost and the largest consumer of underground electrical power. The effectiveness of t
Jul 1, 2013
-
Optimising Flow in the Mining Value ChainBy A Dunne, R Kruger, H Coleman, P G. Laurens
External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc
Jul 13, 2015
-
Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case StudyThroughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c
Nov 25, 2010
-
The Use of Reverse Cleaning in Testwork on Currawong Copper-Zinc OreLaboratory testwork was carried out on an overall orebody composite, of 2.9 per cent Cu and 4.2 per cent Zn, prepared from drill core taken from the Currawong fine-grained, copper-zinc massive sulphid
Jan 1, 1999