Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Planning for the Drumanard Highway Tunnels, KentuckyBy Lawrence Williamson, Randall J. Essex, David P. Field
As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or
Jan 1, 2005
-
The Effect of Y on the Refinement of Cast and Rapidly Solidified Tial AlloysThe effect of rare earth element Y (0-2.0at.%) on the microstructure of TiAl alloys at the as cast and rapidly solidified conditions has been investigated. The results show that the addition of Y grea
Jan 1, 2010
-
Behaviour of Refractories in Zinc Concentrate Roasting FurnacesFire-clay blocks lining the combustion chambers of zinc concentrate flash-roasting, furnaces operating at 1,000-1,200° C. have suffered moderately rapid deterioration due to slagging. The attack
Jan 1, 1959
-
Roasting and Treatment of Auriferous Flotation Concentrates (c643336f-22ff-4a6c-9e00-d8ab21688bb0)R. C. BUCKETT (Lake View and Star Limited) : At the outset I should like to add my congratulations to those already extended to Mr..Norwood on his excellent paper, which has given us all an inspiratio
Jan 1, 1940
-
Alteration at Kisladag gold mine, Turkey – a progressive study in geology, geotechnics and geometallurgyBy Y Öztas, S McKinley, T Baker
The Kisladag Mine, Turkey, is a large porphyry gold deposit which is mined by open pit methods. In operation for over ten years, Kisladag provides an excellent example of how attention to a geologic f
Sep 20, 2017
-
The Use Of Rim- To Detect Geologic Anomalies In The Clarion SeamBy M. Craig Miller
As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete
Jan 1, 1990
-
A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
X-Ray Tomography Study on the Effect of Porosity on Fatigue Crack Initiation and Propagation in AM60 Die CastingBy Zhuofei Yang, Jidong Kang, David S. Wilkinson
The fatigue behavior of AM60 high pressure die casting magnesium alloys was studied in a straincontrolled manner. The fatigue test was interrupted every 2,000 cycles for X-ray tomography scanning. The
Jan 1, 2014
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
IC 8932 Costs And Effects Of Environmental Protection Controls Regulating U.S. Phosphate Rock MiningBy Ronald F. Balazik
This Bureau of Mines study identifies and examines the costs of Federal, State, and local environmental protection controls on domestic phosphate rock mining, The costs include the expenditures needed
Jan 1, 1983
-
Large Diameter Tunnel Boring Machine DevelopmentBy Martin Herrenknecht
The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula
Jan 1, 2010
-
RI 7643 Creep And Other Properties Of Zinc-Copper-Titanium Alloys Annealed After RollingBy L. A. Neumeier
The Bureau of Mines evaluated creep properties of Zn-Cu-Ti alloys that were annealed after finish-rolling either cold) or at 480° F (249° C). Compositions ranged up to 1.25 pct Cu and 0.36 pct Ti. Mos
Jan 1, 1972
-
OFR-114-84 Erodibilities And Eroded Size Distribution Of Western Kentucky Mine Spoil And Reconstructed TopsoilBy B. J. Barfield
Standard erosion plots (4.6 m by 22.1 m on 9 percent slope) were constructed on the Alston Surface Mine of Peabody Coal Company in Western Kentucky to evaluate the effects of placement technique and d
Jan 1, 1983
-
Innovative Design At Lake LenexaBy Jacques Moraille
The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for
Jan 1, 2009
-
RI 3608 Manganese Investigations - Metallurgical Division - 4. Ore-Dressing Studies Of Manganese Ores - Concentration Of Manganese-Bearing Ore From The Dobbins Mine Of Cartersville, Ga.By T. L. Johnston
The Dobbins property, about 4-1/2 miles northeast of Cartersville, Ga., was fist operated in 1866, it is the oldest manganese mine in Georgia and one of the oldest minus in the United States still pro
Jan 1, 1942
-
RI 3608 Manganese Investigations - Metallurgical Division - 4. Ore-Dressing Studies Of Manganese Ores - Concentration Of Manganese-Bearing Ore From The Dobbins Mine Of Cartersville, Ga. (f4b31e00-12b5-478f-b866-3ce2c9a0a350)By T. L. Johnston
The Dobbins property about 4-1/2 miles northeast of Cartersville, Ga., was first operated in 1866. It is the oldest manganese mine in Georgia and one of the oldest mines in the United States still pro
Jan 1, 1942
-
IC 8776 Safety Aspects Of Longwall Mining In The Illinois Coal BasinBy Ernest A. Curth
The Bureau of Mines and Old Ben Coal Co. concluded a cost-sharing contract in 1975, the objective of which was to demonstrate the Herrin No. 6 coalbed in southern Illinois can be mined safely by longw
Jan 1, 1978
-
IC 8900 Future Trends And Prospects For The Australian Mineral Processing SectorBy L. Nahai
An important objective of the Australian Government's policies on resources development is to encourage further processing of raw materials domestically, to the extent that this is economically f
Jan 1, 1982
-
IC 9199 Mining And Reclamation Of A Central Florida Forested Wetland: A Case StudyBy James R. Boyle
The Bureau of Mines initiated a program to address short-and long-term objectives of wetlands restoration as a option for reclamation of lands mined for phosphate. The short-term objectives were to id
Jan 1, 1988
-
OFR-16-81 Development Of Lightweight Air Powered Drill Tool For Probe Drilling In Anthracite MinesBy William H. Hamilton
This report describes the results and conclusions of the development and evaluation of a unique concept for a lightweight air powered drill tool for probe drilling in anthracite mines. A concept mo
Jan 1, 1979