Search Documents

Search Again

Search Again

Sort by

  • SME
    Operating Ideas That Have Saved Me Some Bucks-Gold Milling at Rayrock

    By Debbie Laney

    DOUG HALBE: Second in our quick run-through on "Operating Ideas That Have Saved Me Some Bucks," was Debbie Laney of Rayrock Mines. Debbie apologizes. She can't be here. But she said, "Doug, don&a

    Jan 1, 1998

  • SME
    Ventilation And Climate Simulation Of Development Ends In Metal Mines

    By P. Rostami

    It is important to study the ventilation system in order to better design and control of the working environment in deep underground mines. With increasing depth, heat, and humidity performance may be

    Jan 1, 2011

  • SAIMM
    The Beneficial Effects Of Feeding Dry Copper Concentrate To Smelting Furnaces And Development Of The Dryers

    By S. L. Chen

    Keywords: copper, concentrate drying, steam dryer, dryers By placing additional demands on energy and gas flow, the moisture content of a copper concentrate has an adverse effect on the smelting p

    Jan 1, 2006

  • NIOSH
    IC 7143 Annual Report Of Research And Technologic Work On Coal, Fiscal Year 1940 - Introduction

    By Arno C. Fieldner

    This is the fifth of a series of annual reports4/ of technologic investigations conducted by the Bureau of Mines on the occurrence, properties, mining, preparation, and uses of coal. The research of t

    Jan 1, 1940

  • TMS
    Recovery of Tellurium from Cadmium Telluride Photovoltaic Module Manufacturing Scrap and other Sources

    By Wenming Wang

    Recycling of retired cadmium telluride (CdTe) photovoltaic (PV) modules has attracted attention due to new European environmental regulations. Recycling tellurium from CdTe PV modules is becoming more

    Jan 1, 2006

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • AUSIMM
    Modelling Fines in Blast Fragmentation and its Impact on Crushing and Grinding

    By W Valery, S Morrell

    In the mining industry blasts are usually designed to fracture the in situ rock mass and prepare it for excavation and subsequent transport. The run of mine (ROM) fragmentation is considered good when

    Jan 1, 1999

  • SAIMM
    Process Developments At Tailings Leach Plant

    By Martin Banda, Gift C. Chisakuta, Moses Chabinga

    KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count

    Jan 1, 2005

  • AUSIMM
    The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South Australia

    Geotechnical conditions in the Lochiel Deposit are somewhat unusual, and thus geotechnical and hydrological investigations have assumed a high priority. The cost of mining the deposit has been sho

    Jan 1, 1986

  • SME
    International Standards in Public Participation in Financing Oil and Gas Pipelines: The Transparency of Risk Management Measures and Emergency Response Plans

    By E. Nickel

    "Bi- and multilateral banks as well as export credit agencies in the OECD countries, but also numerous commercial banks, last year committed themselves to compliance with the World Bank’s standards. T

    Jan 1, 2005

  • SME
    Events leading to Colombia’s Ruiz volcano eruption and its results described

    By Antonio Rivera

    On Nov. 13, 1985, Colombia's Ruiz volcano erupted, killing an estimated 25,000 people and burying several villages. Damages were estimated to be about $US300 million. The following is an accou

    Jan 2, 1986

  • NIOSH
    Railroad Locomotive Whole-Body Vibration Study: Vibration, Shocks And Seat Ergonomics - Introduction

    By R. Luhrman, E. Christ, B. Gores, S. Fischer, E. Johanning

    North American railroad locomotive operators (engineers and conductors) are exposed to multi-axis vibration and shocks (1, 2). A recent epidemiological survey showed a prevalence of serious type of ne

    Jan 6, 2006

  • NIOSH
    RI 3568 Asphalts From Some Wyoming And Other Asphalt-Bearing Crude Oils ? Introduction (50643c65-85c3-4e18-90cc-d41076ab62d0)

    By K. E. Stanfield

    [Asphalt ~~d road oil ar8 the principal products manufactured from Wyor.1in~ Ilblack oilo" \r,hich, beca.use of th?lir hig.~ E\.sphal t and hig} sulfur COi.1Jce~1t, .!?re difficult e':ld costly t

    Jan 1, 1941

  • NIOSH
    Mine Gases And Methods For Detecting Them - Introduction

    By J. J. Forbes

    This publication is a revision of the first of a series of four Miners' Circulars originally prepared and issued in 19'29 for use in a course of training designed to prepare mine officials t

    Jan 1, 1954

  • SME
    Wireless Access To Live Data From Mining Operations - Anywhere & Anytime

    By R. Heersink, C. H. Wells

    Innovations in communications and real-time information systems are providing industry opportunities to improve profitability. Real-time operating data is collected from equipment across a site or ev

    Jan 1, 2002

  • SME
    Empire Pebble Crushing Circuit, Going Back To Basics, Is The Crusher Crushing?

    By H. Walqui

    This paper describes operating gains resulting from standardizing operating and maintenance practices to improve the performance of the pebble crushing circuit at he Empire Concentrator. Past efforts

    Feb 27, 2013

  • SME
    Conveyor Pulley Specifications For Aggregates

    By D. Keech

    The Conveyor Equipment Manufacturers Association (CEMA) specification B105.1 “Welded Steel Conveyor Pulleys” adequately defines standard pulleys for most aggregate material handling applications. How

    Jan 1, 2003

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • IIMP
    Implementación Industrial de Adición de Oxigeno en la Optimización de la Cianuración de Au y Ag en Cia. Minera Ares S.A.C.

    By V. Eloy Román

    El presente trabajo evalúa la adición del oxígeno puro al circuito de cianuración, con la finalidad de incrementar el porcentaje de recuperación de oro y plata, así como su efecto sobre el consumo de

    Sep 12, 2005

  • AUSIMM
    Research on the Differential Flotation of Iso-Floatable Lead-Zinc Sulfide Ore

    Research on the Differential Flotation of Iso-Floatable Lead-Zinc Sulfide Ore

    Sep 13, 2010