Search Documents

Search Again

Search Again

Sort by

  • DFI
    Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway Bridge

    By Mohammad Eslami

    The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway

    Jan 1, 2010

  • AUSIMM
    Dealing with Organic Wastes and Byproducts - One Economic and Environmentally Sound Solution

    By Keet B. A, Waid J. S

    The Gippsland Basin is one of Australia's most important producers of petroleum products. An inevitable byproduct of the production, refinement and transport of the millions of barrels of oil i

    Jan 1, 1992

  • AUSIMM
    Advances in Coarse Particle Flotation - Copper and Gold

    By H Thanasekaran, J Kohmuench, B Seaman

    To achieve an efficient separation in the flotation process, valuable particles need to be selectively segregated from the gangue while utilising a minimum number of flotation stages. TodayÆs existing

    Jul 15, 2013

  • SME
    Fine Coal Cleaning Using A Centrifugal Fluidized Bed Separator

    By Mutombo Nombe, Avimanyu Das, Rick Honaker

    Enhanced gravity separators (EGS) provide a more efficient separation than froth flotation when cleaning coal in the 150 x 25 µm particle size range. To improve the performance of an EGS unit, air bub

    Jan 1, 2005

  • DFI
    High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place Piles

    By Garland E. Likins

    High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec

    Jan 1, 1995

  • DFI
    Accessing History

    By Richard Pizzi

    Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to

    Jan 1, 2011

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • AUSIMM
    Mineral Matter in Australian Bituminous Coals

    The mineral matter has been isolated from a selection of Australian bituminous coals using low temperature (radio-frequency) oxidation or hydrogen peroxidation techniques and the species present ident

    Jan 1, 1978

  • IOM3
    Mechanism of cut blasting

    By S. P. Singh

    The purpose of the cut is to provide a free face to which the remainder of a development or breasting round can break. The results of field testing in drifts and at a quarry face were used as a basis

    Dec 1, 1995

  • NIOSH
    RI 5446 Reconnaissance Of Nevada Manganese Deposits - Summary

    By Russell R. Trengove

    The largest potential reserves of manganese in Nevada are in the Pioche district. To date, these large reserves of 10-to l2-percent manganese cannot be upgraded economically. Other large, low-grade de

    Jan 1, 1959

  • DFI
    Spin-Fin Pile Technology

    By Dennis Nottingham

    Spin-fin pipe piles can develop large loads in tension, thus have evolved as a foundation product of great potential. Currently, over 500 spin-fin piles have been used successfully in dolphins, docks,

    Jan 1, 1990

  • SME
    The Status Of Gold And Silver Leaching Operations In The United States

    By Michael G. Pojar, Peter G. Chamberlain

    Solution mining, primarily by heap leaching, has emerged as an important method for mining gold and silver in the United States. Heap leaching offers many economic and environmental advantages over co

    Jan 1, 1981

  • AUSIMM
    Characterisation and Monitoring of the Stress State of Production Pillars at El Teniente Mine

    By R Munoz, R González, J Vallejos, A Delonca

    In panel caving in underground mines, it is essential to characterise and monitor the stress and stability state of production level pillars to ensure the extraction of the mineralised ore column and

    May 9, 2016

  • CIM
    IsaMill Fine Grinding Technology and its Industrial Applications at Mount Isa Mines

    By Michael Young, Peter Allum, Mingwei Gao

    "Tough economical conditions and high grade but fine-grained ore processing have forced the mining industry to look for more efficient processes. Isa Mill Technology for ultra-fine and fine grinding i

    Jan 1, 2002

  • AUSIMM
    Field Performance of Fully Encapsulated Reinforcement during Violent Failure Events

    By E Villaescusa, C Drover

    Fully resin encapsulated threaded bar and cement grouted cable bolts are common forms of reinforcement for underground mining excavations constructed at great depth. These elements are frequently inst

    May 9, 2016

  • SME
    Recovery Of Expanded Polystyrene From Coated Patterns Rejected From Lost Foam Casting (7e824799-4a95-4f4f-bb75-096af0709dc7)

    By J. Drelich, J. Pletka

    Lost foam casting patterns are foamed polystyrene shapes glued together into the shape of the part to be cast and are coated with a refractory material consisting of a mineral mixture and binders. Pr

    Jan 1, 2001

  • SAIMM
    Strategic mine planning?communicating uncertainty with scenarios - Synopsis

    By G. L. Smith

    This paper introduces and defines the concept of a linkage between long-term planning parameters (?global assumptions?) and possible future world views as conceived in scenario planning. Scenario plan

    Jan 1, 2008

  • SAIMM
    The Practical Application Of The Wemco Hms Drum Separator In The Mining & Metals Recycling Industries - 1. Introduction

    By K D. Wilkes

    The WEMCO Heavy Media Drum Separator was first introduced by WEMCO in California in the 1940`s, initially from their base in San Francisco and later when the company moved to Sacramento. The WEMCO Co

    Jan 1, 2006

  • SME-ICGCM
    A Case Study of Longwall Roof-Supports Interaction

    By Y. H. Wang

    During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research

    Jan 1, 1986

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991