Search Documents

Search Again

Search Again

Sort by

  • SME-ICGCM
    Design And Hazard Assessment Of Mine Ore Passes

    By M. J. Beus

    This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro

    Jan 1, 1996

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • SAIMM
    Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? Synopsis

    By E. Demir

    Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe

    Jan 1, 2012

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • DFI
    Design and Installation of Helical Piles for Support of Bridge Pier Foundation

    By David L. Borusiewicz, M. Suri Surendra

    "Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc

    Jan 1, 2014

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits

    By Shaw-Shong Liew

    This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa

    Jan 1, 2002

  • CIM
    Design and Maintenance of Platework and Vessels in Mines

    By A. J. Paul Laprairie

    The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can

    Jan 1, 1963

  • SME
    Design And Operating Characteristics For Large Flotation Cells ? Historical

    By Nathaniel Arbiter

    The development of flotation machines since the first industrial use of the process can be divided into three stages. The first, up to about 1930, was marked by diversity in the means for contacting f

    Jan 1, 1979

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979

  • TMS
    Design and Operation of the Noranda Process Continuous Smelter

    By L. A. Mills

    After three years of experience in operating the pilot plant for the Noranda Continuous Smelting Process, the decision was made, in March 1971, to build an 800 ton per day commercial plant at Noranda,

    Jan 1, 1976

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SAIMM
    Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine

    By B. P. Watson

    Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i

    Jan 1, 2014

  • DFI
    Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, Pennsylvania

    By Brian H. Greene

    The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo

    Jan 1, 2006

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005

  • SME
    Design And Start Up Of The Cortez Gold Mines Pipeline Mill

    By R. N. Powell

    The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the

    Jan 1, 1999

  • SME
    Design and Startup of Cortez Gold Mine’s Pipeline Mill

    By Randy N. Powell

    The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas

    Jan 1, 1999

  • SAIMM
    Design And Support Of Rockpasses At Ultra-Deep Levels

    By F. M. C. C. Vieira

    The DEEPMINE Research Programme sought to develop the technology and competence to mine gold safely and profitably at depths of 3 to 5 km. Among the many issues addressed was the stability and support

    Jan 1, 2005