Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water IntersectionBy M. F. Wells
The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w
Jan 1, 1999
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora ProjectBy H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector FacilityBy Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Construction of a Monolithic Silica Reverberatory Furnace BottomA poured slag bottom is universally considered to be the best type bottom for copper reverberatory furnaces. It is impervious to molten matte and ready for immediate use.When molten slag is not availa
Jan 1, 1939
-
Construction Of A TBM Launch Box In A Complex Urban EnvironmentBy Vincent Tirolo
The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F
Jan 1, 2013
-
Construction Of A Watertight Deep Shaft In The Unstable And Water-Bearing Strata Of The Saskatchewan Potash FieldBy Erwin K. Roesner
The difficulties encountered while sinking deep shafts for Potash Mines in southern Saskatchewan have been the subject of several papers in the past. Geological and hydrological conditions of the stra
Jan 1, 1980
-
Construction Of Coal Mine Waste Disposal Systems Consistant With Environmental RegulationsBy Richard E. Lounsbury
Coal mine refuse handling traditionally has been the redheaded stepchild of the industry - a problem to be ignored as much as possible. During the past few years, however, mining companies have become
Jan 1, 1973
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - SynopsisBy A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, OregonBy Yves St-Amour, Vince Luongo
This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately
Jan 1, 2005
-
Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CABy Jeremy Theys
The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Construction Of Explosion Resistant Seals – Preprint 97-83By C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Feb 24, 1997
-
Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri LankaBy Jamal Rostami, Ataollah Rahbar
"Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a
Jan 1, 2016
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box JackingBy Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Construction Of Large Underground Openings And Use Of Grouts ? SynopsisBy E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Construction Of Permanent Intruded Plugs At South Deep Gold MineBy D. A. Bruce
The paper describes the construction of 5 plugs to resist high water heads at depth within the South Deep Gold Mine, Randfontein, South Africa. A total of 20 segments were involved to create these plu
Jan 1, 2006