Turkey operates its first overland conveyor with horizontal curvesBy M. Sagheer
An 8.5-km (5-mile) conveyor has gone into operation in western Turkey to eco¬nomically transport crushed lignite from the mine area to a power plant. This conveyor has replaced trucks as the principal
Jan 1, 1989
-
Incorporating Cycle Time Dependency In Truck-Shovel ModelingBy A. Anani
The need to optimize surface mining operations has led to the use of discrete event simulation (DES) modeling of truck-shovel systems. Often, these models assume truck cycle times are independent and
Feb 27, 2013
-
Assessment of stability of flow in a modified mine ventilation network considering a presence of fire hazardsBy W. Dziurzynski
The present article sets forward the results of field tests that made it possible to validate the mathematical model used in the VENTGRAPH ventilation engineer programmes. The case considered relates
Jan 1, 2009
-
Environmental Assessment Study For Extension Of Spadina Subway In TorontoBy Verya Nasri, Scott Thorburn
The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi
Jan 1, 2007
-
Mining Engineering – Shovel and Excavator SurveyBy Lane White
In mid-April 1992, MINING ENGINEERING mailed a survey questionnaire relating to mining shovels and hydraulic excavators to 125 SME members working at surface mines or at the headquarters of companies
Jan 1, 1992
-
Tunneling In Residual Soil And RockBy Lee W. Abramson, Kenneth P. Akins
The authors have accumulated published data on residual soil and rock tunnels in the United States and have compared it to transit tunneling experience in Atlanta, Georgia, and tunnels in other soil a
Jan 1, 1983
-
Reclamation At The Santa Fe/Calvada Mine Breaks New GroundBy Leslie Burnside
Homestake Mining Co. set out to complete final reclamation at a former open-pit gold mine in west central Nevada. The goal was to exceed regulatory standards by satisfying the company's own high
Jan 1, 1999
-
Software For Hydrologic Monitoring Of In Situ Leaching OperationsBy Peter K. Mathison
The U. S. Department of Interior, Bureau of Mines (Bureau) is developing a hydrologic monitoring system for in situ leaching operations. A working prototype of this system was installed and tested at
Jan 1, 1992
-
Timing, Motivation, Technology Important for Improved Mining ProductivityBy William G. Doepken
With most of the mining industry emerging from the deepest business recession in 50 years, primary attention must be given to surviving in a business climate where dominant foreign competition, depres
Jan 11, 1983
-
A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho
Jan 1, 2009
-
Analysis Of Enhanced Coalbed Methane Recovery Through Carbon Sequestration In The Central Appalachian BasinBy M. J. Miller, N. Ripepi, M. Karmis, J. M. Conrad
Unmineable coal seams present an opportunity to sequester carbon dioxide emissions from power plants, while enhancing the recovery of coalbed methane. Injected carbon dioxide is adsorbed and stored o
Jan 1, 2006
-
Stability Analysis For Steep-Slope Mines Reclaimed Using The Forestry Reclamantion ApproachThe Forestry Reclamation Approach (FRA) specifies that the upper 1.22 m of material on the reclaimed surface should be left as uncompacted as possible to facilitate tree root growth. One of the main c
Feb 27, 2013
-
Optimization In Large TunnelsBy H. S. Rathor
NTPC (National Thermal Power Corporation), a multi-unit organization, is generating 26% of India’s total power. This power is produced from its 14 coal based stations and 7 gas based stations. NTPC is
Jan 1, 2005
-
Application Of Lightweight Beds For Haul Trucks At Lone Tree Mine (Doing More With Less)By T. Mills, M. Evatz
Newmont’s Lone Tree Mine, located in northern Nevada, is an open pit gold operation supported by a standard truck and shovel mine production fleet (Caterpillar 785Bs and Hitachi EXs). Newmont continu
Jan 1, 2001
-
A Dissolution Kinetic Model For Metal Powders A Case Of Varying Surface AreaBy Kenneth N. Han, Peter Nam-soo Kim
A kinetic model for leaching of particulate metals in a batch system has been developed. The leaching mechanism has been analyzed by solving a series of ordinary differential equations relating hetero
Jan 1, 2005
-
Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy ConstructionBy Peter J. Tarkoy
A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and
Jan 1, 1983
-
Simulating Concentrators From Feed To Final Products Using A Multi-Component MethodologyThe ability to optimise a concentrator from mill feed to final products requires a simulator which integrates comminution, classification and separation modelling. In order to model this range of proc
Feb 27, 2013
-
Corporate social responsibility within the mining industry: case studies from across Europe and RussiaBy E. A. Adey, C. Baciu, P. Whitbread-Abrutat, M. Varul, T. Ejdemo, R. K. Shail, F. Wall
Responsible mining requires stakeholder engagement throughout all operational stages and after mine closure. By assessing the current and anticipated future socio-economic and environmental impacts, a
Jan 1, 2011
-
The Challenge Of Building Tunnel Boring Machines For The Eurotunnel ProtectBy David L. Shearer
INTRODUCTON James Howden first secured an order for two Service Tunnel Boring machines in November 1986. These Tunnel Boring machines were 5.7 and 5.4 metres in diameter and the full length includi
Jan 1, 1989
-
Minesite Avalanche – Some Lessons LearnedBy Tim Hurley
On Friday, May 27, 1983 at about 6 p.m., an avalanche occurred at the Revenue-Virginius Mine. Six mine personnel and two contract diamond drillers were trapped when the avalanche covered and blocked
Jan 1, 2006