Search Documents

  • TMS
    Static And Dynamic Synergistic Effects For Ni(II) Extraction And The Application To Waste Solution Containing Ni(II)

    By Junji Shibata

    Keywords: Synergistic effect, Solvent extraction, Nickel ion, extractant mixture Waste solution from the Ni non-electric plating process contains 4.0 kg/m3 Ni (II), 0.1 kg/m3 Fe (III), 0.01 kg/m3 Z

    Jan 1, 2005

  • AUSIMM
    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Sep 13, 2010

  • IOM3
    QTz curves for two skew distributions

    By A. Berckmans

    The key variables in the financial analysis of a mining project include the metal price and the quantities of ore and metal. In general, if the metal price drops, the cutoff grade is increased so as t

    Dec 1, 1996

  • ISEE
    A Quantitative Triple Bottom Line Mine to Mill Process Evaluator

    By X. Gumede

    A model is being developed to quantify the benefits for mining houses resulting from the reduction in greenhouse gas and energy consumption by the application of innovative blast designs in addition t

    Jan 1, 2012

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • NIOSH
    RI 8274 Coal Mine Floor Heave in the Beckley Coalbed, An Analysis

    By James R. Aggson

    This Bureau of Mines report describes floor heave ground control problems that have been encountered in a new underground coal mine in West Virginia. Previous experience in the coal seam, the results

    Jan 1, 1978

  • SME
    A Novel Approach in Predicting Dump Truck Tyre Life in a Mine Based on Multilayer Perceptron Neural Network Optimised with Particle Swarm Optimisation - Mining, Metallurgy & Exploration (2024)

    By Yao Yevenyo Ziggah, Victor Amoako Temeng, Solomon Evans Kweku Koomson

    Tyre hours/life deficit is a major operational challenge facing the mining industry which adversely affects materials production and costs. An accurate forecast of the tyre life is key in addressing t

    Mar 11, 2024

  • SAIMM
    A Long Hole Stoping System For Mining Narrow Platinum Reefs - Introduction

    By P. van Dorssen

    In South African metalliferous mines, stoping operations are largely confined to narrow, tabular orebodies making mechanization extremely difficult. Limited flexibility in terms of stope width has nec

    Jan 1, 2002

  • NIOSH
    IC 9513 - Proceedings Of The Second American Conference On Human Vibration

    There is a saying, ?If it moves, it vibrates.? This is especially true in our modern industrial environments, where workers use powered tools, machinery, vehicles, and heavy equipment. How workers are

    Jun 1, 2009

  • CIM
    In situ testing in underground backfilled stopes

    By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia

    "An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This

    Jan 1, 1987

  • SME
    Haulage 2002: Lowering Haulage-Equipment Costs

    By Steve Kral

    Reducing the cost per ton and increasing productivity are key factors in a mine’s profitability. Mining companies can do little about commodity prices. So to keep a mine operating at a profit, manag

    Jan 1, 2002

  • NIOSH
    OFR-56-77 Personal N02 Sampler System Demonstration

    By Frederick C. Tompkins

    A complete service system was established for the monitoring of personnel exposure to N02 based upon the use of passive dosimetry. This system is structured such that minimum effort is required of the

    Jan 1, 1976

  • NIOSH
    OFR-16-79 Evaluation Of Coal Deposits In The Narragansett Basin, Massachusetts And Rhode Island

    This report summarizes the results of the Narragansett Win Projec't's activities during the U.S. Bureau of Mines (BOM) Phase 1, which was transitional from and which followed the National Sc

    Jan 1, 1979

  • SAIMM
    The influence of Fe3+/Fe2+ratio on the viscosity of silicate slags

    Viscosity measurement was carried out over a narrow range of silica content around the fayalite composition. A wide range of temperature and oxygen potential was covered where the slag was completely

    Jan 1, 2004

  • NIOSH
    OFR-186(2)-83 Development Of A Continuous Shaft Lining System - Volume II

    By Robert Torbin

    The objectives of the Continuous Shaft Lining (CSL) System are to reduce the costs, safety hazards, and time currently required in lining mine shafts with concrete. The CSL will line machine bored sha

    Jan 1, 1983

  • SME
    Boggo Road Busway Project, Brisbane, Australia

    By Ted Nye

    This paper describes a number of aspects of the design and construction of a driven tunnel which forms part of the Boggo Road Busway project. The driven tunnel is 430m long with an excavated width of

  • CIM
    Sinking No. 4 Shaft at Hartebeestfontein Gold Mining Company, Ltd

    By D D. Deacon

    A brief description is given of the requirements which No. 4 Shaft has been designed to meet and of the methods by which two-stage winding of rock has been accommodated in a single shaft sunk to a dep

    Jan 1, 1965

  • AIME
    Producing-Equipment, Methods and Materials - Perforating of Multiple Tubingless Completions

    By W. T. Bell, M. P. Lebourg

    The perforating of multiple tubingless completions, in which two or more strings of 27/8-in. OD casing are installed in the same borehole, presents two basic problems. First, good completion practices

  • NIOSH
    RI 9207 - Fire Endurance of Mine Stoppings

    By D. Ng

    A facility to evaluate the fire endurance of mine stoppings was constructed by the Bureau of Mines in the multiple entry section of the Bruceton (PA) Experimental Mine. Stoppings up to 6 by 18 ft can

    Jan 1, 1988

  • SME
    Stochastic Modeling Of Stormwater And Receiving Stream Concentrations

    By R. W. Chappell, M. W. Hills, R. L. Olsen

    A stochastic approach was developed and applied to the Butte, Montana Hillside abandoned mining site for modeling stormwater runoff and subsequent receiving stream loadings. This approach enabled cap

    Jan 1, 2002