Search Documents

  • AUSIMM
    Mining Methods in the Waihi Mine, N.Z.

    By Johnston W. H

    MINING operations in the Waihi mine began, under the present proprietorship in the year 1889. Previous to this, and as far back as the year 1880, the presence of reefs in the Martha Hill had been know

    Jan 1, 1912

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • AUSIMM
    Primary Magmatic Segregation Deposits in New Zealand, their Characteristics and Tectonic Setting

    Mineral deposits in New Zealand whose origin can be ascribed to primary magmatic segregations are associated with mafic-ultramafic complexes related to two orogenic episodes which took place during Pa

    Jan 1, 1980

  • AUSIMM
    Magnetite Recovery Using a Wet Drum Separator

    By Lyman G. J

    Magnetic separator operation in the recovery of magnetite in heavy medium circuits was studied by conducting a series of tests on a full size wet drum magnetic separator.The significant operational va

    Jan 1, 1983

  • SME
    Leaching Behavior of Lithium from Bauxite Residue Using Acetic Acid Mining, Metallurgy and Exploration (1c2dd284-40d8-467a-9f57-cf193eac1926)

    By Ning Wang, Tengfei Guo, Wanyan Li, Hanjie Wen, Hannian Gu, Zehai Li

    Bauxite residue (red mud) is an alkaline waste derived from the industrial process for extraction of alumina from bauxite ore. Some bauxite residues contain considerable concentrations of critical met

  • AUSIMM
    Consultation with Tangata Whenua

    By C N. Whata

    While there is no specific obligation on the part of any applicant to consult directly with tangata whenua (people of the land), recent cases highlight the need to engage in active consultation in ord

    Jan 1, 1997

  • DFI
    Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC

    By Joseph C. Gillen

    This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d

    Jan 1, 2006

  • DFI
    High Stress Pile Testing At Soldier Field

    By Michael H. Wysockey

    The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu

    Jan 1, 2002

  • AUSIMM
    Sumps Aids the Broken Hill Proprietary Company Limited in Saxonvale Feasibility Study

    By G T. Kukla

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine planning sy

    Jan 1, 1980

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • SAIMM
    Transfer Function For The Seismic Signal Recorded In Solid And Fractured Rock Surrounding Deep Level Mining Excavations

    By A. Cichowicz

    The objective of this work is to quantify the effect of the rock mass surrounding a stope or a tunnel on the seismic signal so that the rockburst damage on the excavation can be derived. It has been s

    Jan 1, 1999

  • NIOSH
    OFR-100(4)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Appen A: Program Of Instruction-Modules 10-17 - Appen B: Instructional Time Breakdowns - Phase II Report ? Appen A (Continued) Program Of Instruction

    [Module 10. Internally Cued Operating Contingencies Prerequisite: Modules 1-7 - Estimated Instructional Time: 2.42 hrs. Module Abstract Trainees, using programmed instruction, describe the cues

    Jan 1, 1976

  • CIM
    Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)

    By Walter Herd

    For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i

    Jan 1, 1929

  • CIM
    Asarco LLC Hayden Converter Retrofit Project – An Update

    By K. Parameswaran, A. Veek, A. Fernandez, P. Safe

    ASARCO LLC (Asarco) Hayden Copper smelter, in Hayden, Arizona, has operated continuously (except for minor labor and economic curtailments) since 1912. The current plant configuration comprises INCO f

    Jan 1, 2019

  • SME
    Leaching of Trace Amounts of Metals from Flotation Tailings in Cupric Chloride Solutions Mining, Metallurgy and Exploration

    By Pelin Altinkaya, Maria Leikola, Jussi Liipo, Mika Haapalainen, Mari Lundström, Eero Kolehmainen

    With decreasing ore grades, the tailings of mining operations are becoming of increasing interest as metal-containing secondary raw materials. The objective of the current work was to investigate chlo

  • SME
    Investigation of Climatic Conditions in Underground Coal Mining Mining, Metallurgy and Exploration (63acde09-eb8c-4eb1-b788-340f56a030a7)

    By İbrahim Çınar, Hakan Özşen

    Mine workers in heavy and dangerous work are under several physical risk factors, for example temperature, humidity, noise, vibration, lighting and air velocity. Thermal comfort includes parameters su

  • SME
    Earthquake Engineering Of Tunnels - Revisited

    By G. Norman Owen, Roger E. Scholl

    INTRODUCTION The analysis and design of underground structures to resist vibratory motion due to earthquakes has been of interest to engineers for several decades. The dynamic stability of a powerh

    Jan 1, 1985

  • DFI
    International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997

    This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja

    Jan 1, 1997

  • NIOSH
    IC 6346 Mining Laws of Canada

    By John W. Frey

    Although there are certain general uniform provisions in the laws ... of the several Provinces of Canada the differences are so great that it is considered advisable to present digests of separate min

    Sep 1, 1930

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008