Search Documents

  • NIOSH
    OFR-27-83 Further Studies On Optimum Combined Fire Retardand/Preservative Treatments And Stench Warning Systems For Wood Mine Timber

    By Mark Davis

    As a follow-on to previous investigations, reduced treatment levels for the optimum fire retardant/preservative system were evaluated. An impregnation of 3.5 lbs/ft3 of Fyreprufe followed by 3.5 mils

    Jan 1, 1982

  • AUSIMM
    Pillar Barricades at Broken Hill South Limited, Broken Hill, N.S.W.

    This paper describes the methods of constructing timber barricades against pillars of ore in the South Mine, property of Broken Hill South Limited, Broken Hill, N.S.W., and discusses the behaviour of

    Jan 1, 1946

  • ISEE
    *Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters

    By A. Karadogan, G. Tuncer, A. Kahriman

    Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi

    Jan 1, 2005

  • SAIMM
    Pitfalls In Vezin Sampling For Finely Crushed Materials (4f77bfd3-c00c-4e22-9de0-dc8343fb6770)

    By C. Kruger

    Anglo American Platinum has adopted a strategy of best practice principles (BPP) for sampling, mass measurement, analysis, and metal accounting for more than a decade now. When new plants are designed

    Jan 1, 2014

  • AIME
    Producing – Equipment, Methods and Materials - Application of Material and Energy Balances to Geothermal Steam Production

    By R. L. Whiting, H. J. Ramey

    The basic study from which this paper was prepared was started as the result of the growing need throughout the world for increasing quantities of energy in all forms. Quite obviously, natural forms o

    Jan 1, 1970

  • NIOSH
    RI 4128 Gasification of Lignite & Subbituminous Coal - Progress Report 1945-46

    By E. O. Wagner, A. W. Koth, V. F. Parry, J. B. Goodman, D. C. Gernies

    "INTRODUCTION A commercial-scale pilot plant for gasification of lignite was completed by the Bureau of Mines at Grand Forks, N. Dak., early in 1945 as an extension of work on, gasification of low-ran

    Sep 1, 1947

  • SME
    Industrial Minerals review 2016

    By Jack Bedder

    "Editor’s note: We would like to thank those who make this annual issue possible. A special thank you goes out to the industrial minerals annual review editor, to the Industrial Minerals & Aggregates

    Jan 7, 2017

  • NIOSH
    Flood Prevention In Anthracite Mines, Western Middle And Southern Fields - Anthracite Region Of Pennsylvania - Project No. 2 - Summary

    By S. H. Ash

    THIS REPORT covers the second in a series of five projects into which the Conowingo tunnel system has been divided for geographical and practical reasons. It outlines the construction work contemplate

    Jan 1, 1955

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • SME
    Industrial Minerals 2007

    Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue. Thank y

    Jan 1, 2008

  • AUSIMM
    An Examination of Some Trace Elements in South Wales Coals

    By Pooley F. D

    The coal measures of the South Wales coalfield contain at least 50 horizons at which coal seams are known, to occur. More than 300 samples of coal were collected from these coal measures and this pape

    Jan 1, 1977

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • AUSIMM
    Manufacture of Cement From Blast-Furnace Slag (6eef645a-945d-4a5e-8744-528d84407d12)

    THE successful establishment of iron blast-furnace plants at Newcastle and Lithgow naturally invites attention to the economic utilization of the various products and by-products arising out of the in

    Jan 1, 1918

  • NIOSH
    IC 8157 Sand And Gravel Operations And Costs, Minneapolis-St. Paul Area, Minn. (a77f56cb-f467-46a8-b8a7-27bed9beb5c7)

    By L. G. Marshall

    This report presents a cross section of the sand and gravel operations in the Minneapolis-St. Paul area. The study covers individual operations, economic problems peculiar to the industry, glacial geo

    Jan 1, 1963

  • NIOSH
    RI 3296 Classification Chart Of Typical Coals Of The United States - Showing B. T. U. Per Pound On The Moist, Mineral-Matter-Free Basis, Plotted Against Fixed Carbon On The Dry, Mineral-Matter-Free Basis - 1935 RI 3296

    By A. C. Fieldner

    [The Sectional Committee on Classification of Coals, functioning under the sponsorship of the American Society for Testing Materials and the rules of the American Standards Association, in its 1934 re

    Jan 1, 1935

  • NIOSH
    IC 8157 Sand And Gravel Operations And Costs, Minneapolis-St. Paul Area, Minn.

    By L. G. Marshall

    This report presents a cross section of the sand and gravel operations in the Minneapolis-St. Paul area. The study covers individual operations, economic problems peculiar to the industry, glacial geo

    Jan 1, 1963

  • AUSIMM
    Determination of Relative Economic Values of Mill Returns

    IN concentrating mills, where several millerals are recovered for realisation in more than one product, various systems are used to express the relative economic value of the work done, and, in the ho

    Jan 1, 1931

  • AUSIMM
    Property Trends in Latrobe Valley Brown Coals and Implications for Future Utilisation

    By Wood W, Bell A

    Brown coal production in Victoria's Latrobe Valley Region (Figure 1) continues to rise and currently stands at around 50 Mt per annum. With the exception of around 2 Mt used to produce some 700

    Jan 1, 1992

  • NIOSH
    OFR-111(1)-77 Automatic Fire Protection System For Mobile Underground Metal Mining Equipment - Final Report I Volume I

    By Gene R. Reid

    The contract objective is the development and in mine testing of an Automatic Fire Control System (AFCS) for mobile underground metal mining equipment. The effort described by this report covers the p

    Jan 1, 1976