Search Documents

  • SME
    Recent Developments in Site Investigation and Testing for Hard Rock TBM Projects

    By Levent Ozdemir, Bjorn Nilsen

    For several recent TBM tunnel projects, unexpected ground conditions have been encountered, causing extra cost, considerable delay, and in some cases major claims. Undoubtedly, insufficient and/or irr

    Jan 1, 1999

  • AUSIMM
    A Model for the Intrusive Sequence and Cu-Zn Skarn Formation at the Antamina Deposit, Peru

    By Z Chang, S A. Mrozek

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Antamina, Peru is the largest Cu-Zn skarn deposit in the world. Skarn mineralisation is foc

    Mar 18, 2015

  • CIM
    Building the Next Major Iron Ore Mine in the Labrador Trough

    Certain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu

    May 1, 2011

  • AUSIMM
    Technical Note on Recovery of Manganese from Low Manganese Content Ferromanganese Slag

    By Rao P. K, Sahoo P. K

    The main constituents of ferromanganese slags are silicates of Mn, Ca and AI. Factors affecting the recovery of manganese from a low manganese content ferromanganese slag (about 16 per cent MnO) durin

    Jan 1, 1979

  • AIME
    Minerals Beneficiation - Study of Grinding-Ball Wear Employing a Radioactive-Tracer Technique

    By J. E. Campbell, A. W. Wesner, M. Pobereskin

    This paper summarizes the results of an investigation sponsored by The Coates Steel Products Company. The objective was to determine the relative effects of certain chemical and physical properties on

    Jan 1, 1961

  • CIM
    Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern Ontario

    By Jérôme Girard, Shiu Kam, Sue Longo

    "Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable

    Jan 1, 2011

  • SAIMM
    Potential Metallurgical Treatment Of Copper Concentrates With High Arsenic Contents - Synopsis

    By I. Mihajlovic

    This paper investigates a potential method for arsenic removal from copper concentrates using hypochlorite leaching. The problems concerning pyrometallurgical processing of copper concentrates with hi

    Jan 1, 2011

  • SME
    Design And Construction Service Tunnels On Palm Jumeirah Island

    By Ben Hayes, Michael Ryjevski

    The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira

    Jan 1, 2007

  • SME-ICGCM
    Field Experience Of Measuring The Acoustic Energy From A Hammer Blow To Coal Mine Roof And Its Relationship To Roof Stability

    By Peter Altounyan

    The rate of decay of the energy from a hammer blow to a coal mine roof is related to the size and nature of the contacts between the rock being struck and its surroundings The use of this principle as

    Jan 1, 2000

  • AUSIMM
    Gas Well Testing in the Roma Area

    Gas well tests were performed on 17 wells in the Roma area. The procedure used in the test programme incorporates an initial isochronal test followed by what is described as the "two flow drawdow

    Jan 1, 1968

  • NIOSH
    IC 8085 Equipment, Accessories, And Procedure For Fighting Mine Fires With High-Expansion Foam ? Introduction

    By R. Ward Stahl

    Fire is still a scourge of the mining industry, although many precautionary measures have been and are being taken to reduce the incidence of fires and to combat them. Generally, the success of fire e

    Jan 1, 1962

  • NIOSH
    OFR-35-90 Permitting And Environmental Constraints - Their Impact On Mining In Alaska

    By Gary E. Sherman

    This report presents a Bureau of Mines study on the cost of mine permitting and compliance with environmental regulations in Alaska. It discusses permitting requirements and procedures for placer and

    Jan 1, 1991

  • SME
    Implementation Of Corporate Biodiversity Management Program

    By M. Hamarat

    Freeport-McMoRan Copper & Gold (FCX) is committed to preserving and enhancing biodiversity in the areas in which we operate. As a member of the ICMM, FCX is committed to implement the 10 Sustainable D

    Jan 1, 2011

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • ISEE
    Application of Underground Bulk Explosives in Polyethylene Pipes for Perimeter Control

    By Jena Moshen

    Underground Bulk Systems (UBS) technology has gained widespread application in tunneling and underground mining owing to its safety, reliability, increased Velocity of Detonation (VOD) and excellent r

    Jan 1, 2018

  • SME
    Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143

    By N. Merriam

    This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo

    Feb 24, 1997

  • AUSIMM
    The Heavy Media Separation Coal Washing Plant at Lidsdale, New South Wales

    The Heavy Media Separation plant operated at Lidsdale siding, eight miles from Lithgow, by the N.S.W. Mining Co. is a product of the Western Machinery Company, of D.S.A.This mill, designed to use fine

    Jan 1, 1954

  • SAIMM
    Cracking A Hard Nut: An Overview Of Lonmin?s Operations Directed At Smelting Of UG2-Rich Concentrate Blends

    Keywords: Pyrometallurgy, furnace, Lonmin, platinum, PGM, UG2 Lonmin, earlier than any other primary platinum producer, had to deal with the concentrating and smelting of UG2-rich ores and concent

    Jan 1, 2011

  • DFI
    Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle Hydrodynamics

    By Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume

    "Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub

    Jan 1, 2014

  • AUSIMM
    Near real-time assay with downhole assay tool (FastGrade™ 100)

    By B Chi, A Mahanta, R A. M Maddever, O Dominguez

    BHP Billiton, in collaboration with Sodern and CSIRO, has developed a downhole logging tool for measuring geochemistry in situ. The FastGradeTM 100 (alternatively, FG100), exploits pulsed fast and the

    May 9, 2017