Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Mining Geotechnical Benchmarking

    By Vincent A. Scovazzo

    Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio

    Jan 1, 2000

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • SME-ICGCM
    Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall Recovery

    By Thomas A. Bailey

    Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c

    Jan 1, 2006

  • SME-ICGCM
    Recent Developments in Pre-driven Recovery Road Design

    By Rob Thomas

    Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.

    Jan 1, 2008

  • SME-ICGCM
    Behavior of Welded Wire Mesh Used for Skin Control in Underground Coal Mines

    By Murali M. Gadde

    Welded wire mesh is the most commonly used skin control technique in the United States underground coal mines. Currently, selection of the mesh is based on trial and error rather than any rigorous des

    Jan 1, 2006

  • SME-ICGCM
    Electrical Measurements of Coal Measure Rocks for Electromagnetic Applications in Mining Industry

    By Nikolay Boykov

    Subsurface imaging technologies are part of the electromagnetic (EM) geophysical methods. EM technologies such as radio imaging method (RIM), ground penetrating radar (GPR), and drill string radar (DS

    Jan 1, 2006

  • SME-ICGCM
    Post?Collapse Seismicity of the Crandall Canyon Mine Using Double Difference Relocations

    By Tex M. Kubacki

    In 2007, the University of Utah Seismograph Stations (UUSS) temporarily expanded its seismic monitoring network in Emery County, Utah, in response to the August 6 Crandall Canyon mine collapse that tr

    Jan 1, 2012

  • SME-ICGCM
    The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill Colliery

    By Clive Chadbourne

    Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s

    Jan 1, 1994

  • SME-ICGCM
    Comparison of the Performance of Active and Passive Roof Bolts in An Illinois Basin Coal Mine

    By Anil K. Ray

    This paper discusses in situ studies conducted at an Illinois Basin room-and-pillar coal mine to evaluate the performances of three different types of bolts under similar geologic conditions. The bolt

    Jan 1, 2012

  • SME-ICGCM
    Roadway Strata Management in the New South Wales Underground Coal Mining Industry

    By Rob Thomas

    Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp

    Jan 1, 2007

  • SME-ICGCM
    Nonlinear Approach For Determining Design Criteria For Yield Pillar Performance

    By W. Smith

    The U.S. Bureau of Mines (USBM) is using laboratory and computer-based techniques to investigate the post- failure behavior of yielding pillars and pillar reinforcement techniques to control entry def

    Jan 1, 1995

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994

  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012

  • SME-ICGCM
    Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine

    By D. S. Choi

    This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho

    Jan 1, 1990

  • SME-ICGCM
    Beyond Coalbrook: Critical Review of Coal Strata Control Developments in South Africa

    By J. Nielen van der Merwe

    Rock engineering research and technology development in South Africa only received serious attention in reaction to the Coalbrook disaster in 1960. At the time, a number of gaps in knowledge of rock r

    Jan 1, 2006

  • SME-ICGCM
    Computer Modeling Of Rock Mass Geomechanic State In Longwall Design

    By V. D. Jalevsky

    A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s

    Jan 1, 1996

  • SME-ICGCM
    Load Capacity and Stiffness Characteristics of Screen Materials Used for Surface Control in Underground Coal Mines (10e0c7b9-c7f2-4fd8-a923-cd572692ebf6)

    By Dennis R. Dolinar

    Screen material in the form of welded wire mesh and geogrids are used in underground coal mines to prevent the fall of small pieces of rock from the roof between roof bolts. Further, if the screen is

    Jan 1, 2006

  • SME-ICGCM
    Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems

    By Andrew P. Jarosz

    The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are

    Jan 1, 1995

  • SME-ICGCM
    Coal Pillar Life Prediction in the Vaal Basin, South Africa

    By J. Nielen van der Merwe

    This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri

    Jan 1, 1998