Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • SME
    Effects of Longwsll Subsidence on Escarpment Stability

    By Valois R. Shea-Albin

    Increasing pressure from State and Federal agencies to mitigate mining-induced subsidence damage to overlying structures has presented a unique problem to the coal industry in the western United Stat

    Jan 1, 1986

  • SME
    3D CFD Simulation Of Airflow Re-Distribution And Associated Pressure Drops Inside The Overcast In Underground Coal Mines

    Overcasts are indispensible ventilation control devices to permit one airway to pass over another without mixing in room and pillar coal mining. The airflow distribution inside the overcast depends on

    Feb 27, 2013

  • SME
    Water Tunnel in Liaoning Province, Northeast China

    By Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring

    The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra

    Jan 1, 2007

  • SME
    South African Gold Production: How Long the Dominant Factor?

    By Edward H. Jr. Boyle, Paul R. Thomas

    Introduction It is estimated that nearly 40% of all the gold ever mined in free world countries has been produced by South African operations. There is concern that this immense productive capacity w

    Jan 11, 1984

  • SME
    Accuracy Of Feasibility Study Evaluations Would Improve Accountability

    By Richard L. Bullock

    Believe it or not, mine evaluation and feasibility studies are as old as the industry itself. In the first recorded writing on mining by Agricola (1556), he gave several clues as what to look for in e

    Jan 1, 2011

  • SME
    Nuclear Energy Industry – Past, Present and Future

    By James J. Graham

    Uravan, Ambrosia Lake, Gas Hills and South Texas are all historic names in US uranium. These mining areas supplied the uranium that brought the United States into the nuclear age during the 1960s, an

    Jan 1, 2002

  • SME
    Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? Introduction

    By I. Ocak

    Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme

    Jan 1, 2011

  • SME
    Satellite Remote Sensing-Based Estimates Of Biomass Production On Reclaimed Coal Mines

    Remote sensing methods have been used to evaluate vegetative growth patterns for many applications, though relatively little work has focused on tracking mine reclamation progress. For coal mines in C

    Feb 27, 2013

  • SME
    Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method

    By John F. MacDonald

    This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp

    Jan 1, 1985

  • SME
    Weighted ensembles of artificial neural networks based on Gaussian mixture modeling for truck productivity prediction at open‑pit mines - Mining, Metallurgy & Exploration (2023)

    By Wei Victor Liu, Na Zhang, Chengkai Fan, Bei Jiang

    The truck haulage data from open-pit mine sites are usually massive and multidimensional with multi-peak Gaussian distributions. Artificial neural networks (ANNs) are well-known machine learning algor

    Mar 2, 2023

  • SME
    Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined Shaft

    By D. Kruse

    Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov

    Jan 1, 2011

  • SME
    Solving Mine Drainage Water Issues with Peat-Based Sorption Media

    By P. Eger, D. Green

    "The Soudan Mine was Minnesota’s first iron mine, operating from 1882 to 1962. The mine was donated to the State of Minnesota in 1963 and became a state park in 1965. The mine discharge contains eleva

    Jan 1, 2015

  • SME
    Application Of The Aqueous Biphase Separation (Abs) Process For the Separation Of Ultrafine Industrial Minerals

    By R. Mensah-Biney

    The aqueous biphase separation process (ABS) has been used to separate ultrafine industrial minerals. The partition behavior ofTiO2, Al2O3, Fe2O3 and kaolin was not pH dependent. The partition beha

    Jan 1, 1999

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    The Río Agrio Basin, Argentina: A Natural Analog To Watersheds Affected By Acid Mine Drainage

    The Río Agrio of northern Patagonia, Argentina, is highly acidic due to inputs of volcanic gases (SO2, HCl, HF) in its headwaters. The watershed includes a hyper-acidic (pH <0.5) volcanic crater lake,

    Jan 1, 2008

  • SME
    Impact Of Electronic Blasting Detonators On Downstream Operations Of A Quarry

    By G. Caron, M. Boisclair

    In 2005, CANMET-MMSL used its pool of expertise in ground control, open pit and underground mine engineering, mineral processing, information technology and applied mineralogy to launch a mine-to-mill

    Jan 1, 2007

  • SME
    Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground

    By Joseph M. McCann

    The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio

  • SME
    Reducing Longwall Noise With Acoustical Material On The Shields - 4 Preliminary Analysis – Preprint 97-108

    By A. D. Prokop, J. P. Rider

    Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede

    Feb 24, 1997

  • SME
    Design And Construction Of The Lafayette Bluff Tunnel

    By D. L. Petersen, C. R. Nelson, B. K. Nelson, B. D. Wagener

    The Lafayette Bluff tunnel, currently under construction for the Minnesota Department of Transportation (MnDOT), will be among the widest highway tunnels in the United States. The 199-meter tunnel is

    Jan 1, 1991