Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Sasol Engineering Leadership AcademyBy C. Knobbs
Contrary to the way it is often portrayed, the average organization or company is far from being a cold, calculating machine. It is actually a highly emotive place where interaction with people is a f
Jan 1, 2014
-
Induction Melting Of Ferro-Alloy FinesBy C. Lemire, A. Biscaro
Ferro-alloys are sold according to the size grading specifications of users. Fines are produced during crushing and the amount produced depends on the crushing process and the physical char
Jan 1, 2004
-
Development Of A Mathematical Model For Continuous Tank BioleachingBy L. Bircumshaw
Paper written on project work carried out in partial fulfilment of BSc (Eng) (Chemical) degree This paper details the formulation of a mathematical model for the simulation of a primary bioleach re
Jan 1, 2006
-
Shear-flow coupling properties of a rock joint and its modelling by Geographic Information System (GIS)By Y. Mitani, F. Vallier, T. Esaki
Shear-flow coupling tests are conducted using an original apparatus, and a shear-flow coupling model using Geographic Information System (GIS) is developed in order to evaluate shear-flow coupling pro
Jan 1, 2003
-
Importance of failure mechanisms for management of surface instability risk above abandones minesBy J. P. Josien, Didier C.
ABSTRACT: France now faces the closure of most of its mining sites. Surface instability risk may sometimes remain, especially where large underground voids exist. This paper illustrates the importance
Jan 1, 2003
-
Extending The Upper Particle Size Limit For Coal FlotationNovel flotation reagents were developed to improve the flotation of coarse particles. Laboratory tests conducted on an anthracite coal sample from Kyung-Dong Coal Company, Korea, showed that the reage
Jan 1, 2002
-
Evaluation Of Three Rock Breaker Layouts For Mechanized Block Cave MiningBy J. B. Oosthuizen
Mechanical rock breakers are used in block caving operations to reduce the size of ore fragments which are too large to pass through grizzlys at the load-haul-dumper tipping points. Several layouts of
Jan 1, 1997
-
Development Of Fuzzy Rule-Based Systems For Industrial Flotation Plants By Use Of Inductive Techniques And Genetic AlgorithmsControl of flotation processes is mostly managed by plant operators, who assess the performance of the plant based on their own experience and other heuristic rules. These rules tend to be subjective
Jan 1, 2000
-
The Distribution Of Metallic Elements In Granulated Nickel Converter Matte PhasesBy E. L. Thyse
Keywords: Pyrometallurgy, converter, nickel, matte, distribution Metallic elements occupy a wide range in granulated nickel converter matte phases. The distribution of these metallic elements, pa
Jan 1, 2011
-
Investigation Of Surface Properties Of Gangue Minerals In Platinum Bearing Ores (987425e4-8c6a-401a-a26d-aaffefa9014a)By J. Martinovic
The large proportion of gangue minerals present in platinum bearing ores in South Africa provides challenges to the flotation and downstream processes. In order to take effective measures to reduce th
Jan 1, 2005
-
The Effect Of The Proposed Royalty Billon Mineral Property Values - IntroductionBy E. V. Lilford
The South African Minerals Development Act (?the Act?) has been promulgated and will come into full force and effect once it is gazetted. Thereafter, all Old Order mineral rights will have to be conve
Jan 1, 2003
-
A Chance-Constrained Programming Approach For Open Pit Long-Term Production Scheduling In Stochastic EnvironmentsBy J. Golamnejad
This paper attempts to model long-term production scheduling problems by chance constrained binary integer programming in a stochastic environment. This stochastic model is set up to account for ore b
Jan 1, 2006
-
Estimation Of Optimum Specific Energy Based On Rock Properties For Assessment Of Roadheader PerformanceBy C. Balci
Specific energy is defined as the amount of work required to break a unit volume of rock and is used to predict the performance of mechanical miners. It is obtained from full-scale rock cutting experi
Jan 1, 2004
-
A design protocol for mining remnants in hard rock mining operations utilising a rock mass classification systemA well known rock mass classification system has been altered slightly to address the issues found under remnant mining conditions. By detail study of the expected fracture patterns and local geology,
Jan 1, 2003
-
A Code For The Valuation Of Mineral Properties And Projects In South AfricaBy A. S. Macfarlane
The South African Institute of Mining and Metallurgy was approached by the Australian Institute of Mining and Metallurgy to present a paper on the current practice in terms of the valuation of mineral
Jan 1, 2002
-
Improvement In Ventilation In A Fire Affected MineBy N. Sahay
Improvement in work place environment by conventional methods viz., installation of higher capacity fan, fans in parallel operation or booster fan is a risky proposition in many coal mines in India be
Jan 1, 2003
-
Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? SynopsisBy D. Strachan
Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i
Jan 1, 2009
-
The Complementary Aspects of Ion-Exchange Resins and Solvent Extraction in Copper Recovery ProcessesBy A. Tsekov, Stefan Neufeind, T. Angelov, G. Savov
"A complementary ion exchange/solvent extraction process for the recovery of copper from low-grade ores developed by Iontech Engineering Ltd. is described. It has successfully been implemented on a fu
Jan 1, 2015
-
An Investigation Of Impact Breakage Of Rocks Using The Split Hopkinson Pressure BarBy L. Bbosa
Paper written on project work carried out in partial fulfilment of BSc (Hons) (Eng) (Mechanical) degree Discrete element methods (DEM) are being used to provide detailed impact histories of the par
Jan 1, 2006
-
Part 2: Experimental calibration of sampling parameters K and alpha for Gy?s formula by the sampling tree method ? SynopsisApplication of Gy?s formula is appropriate for calculation of the Fundamental Error (FE) prior to samples being collected at any stage of the minerals process, provided that sampling parameters K and
Jan 1, 2007