Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Feasibility of Applying Probabilistic Risk Assessment to Terrorism

    By Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson

    "The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T), utilizes a probabilistic risk assessment (PRA) approach to explore the risks (anduncertaint

    Jan 1, 2017

  • ISEE
    Mine Expansion Towards Blast Sensitive Areas

    By Scott G. Giltner, Alex Schwenk

    An iron operation sought to extend the life of the mine by conducting a major pit pushback in an area close to several public structures and the neighboring town. The result of the pushback would make

    Jan 21, 2025

  • ISEE
    Application, monitoring, and control of vibrations induced by underground rock blasting using a near-field methodology

    By A. Gontijo, A. Matos, P. Lincoln, L. Fonsecail

    This paper investigates how to manage and model the vibrations caused by rock blasting in a Brazilian underground mine. Considering the frequent detonations and the previous lack of effective vibratio

    Jan 1, 2024

  • ISEE
    OSM Blaster Training Modules for Western Coal Mines and Quarries

    By Cory Loukides, Cathy Aimone-Martin

    Blaster training manuals used by the Office of Surface Mining (OSM) and others are outdated and cumbersome. A new approach has been developed using Microsoft PowerPoint with a Visual Basic overlay to

    Jan 1, 2004

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground Phase 2 – Blasting Campaign in Western USA

    By Karl Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 21, 2025

  • ISEE
    Demonstration that an Efficient Blast Depends as Much on Easy Mucking as on Good Fragmentation

    By R. F. Favreau, Patrice Favreau

    "Ever since we have started to assist those responsible for blasting with blast simulation studies, we havebecome aware of an interesting aspect, namely that in 90 % of cases we are asked ‘‘Can you se

    Jan 1, 2017

  • ISEE
    Journal: 100 Years / The Engineering And Mining Journal New York August 10, 1907 Ground Breaking In The Joplin District Q786 Holes Are Drilled With Air Drills And Squibbed Before Charging. About 1 Pound Of Dynamite Is Required Per Ton Of Rock Broken

    By Doss Brittain

    The term ground breaking is taken to include the process of so loosening the ground as to enable it to be readily loaded into buckets or cars and hoisted from the shaft or drift. In the Joplin distric

    Jan 1, 2008

  • ISEE
    Comparison of Traditional Signature Hole Technique and Monte Carlo Approach

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine.

    Feb 1, 2020

  • ISEE
    Impacts of Measurement Accuracy on Three-Dimension Vibration Models

    By Gavin Yuill, Kameron Ray

    "The impact on vibration model accuracy by input data that is inaccurate was previously unknown, butthought to introduce significant error. This paper explores the impact of accuracy of different GPSr

    Jan 1, 2017

  • ISEE
    Gradation Control Using Low Density Bulk Emulsion

    By Adam T. Young

    This paper will describe the process of using low density bulk emulsion as a means to maximize the production of an oversize or “rip rap” aggregate size range (8 inch to 72 inch) that the quarry custo

    Jan 1, 2017

  • ISEE
    Quantifying NOx Fume Events in Blasting using Drones: Improving Environmental Performance and Public Perception

    By A. Lindo, M. Held

    The formation of NOx fumes is an undesired occurrence and is dependent on a variety of variables. Methods for detection of such fumes with blast analysis tools are available using color schemes for gr

    Jan 1, 2024

  • ISEE
    The Truth About Signature Hole Method

    By Thierry Bernard

    Since the signature hole method principle has been described in the 80's, there has always been a lot of controversy about it. The theory is easy to understand but when it comes to apply it for predic

    Jan 1, 2012

  • ISEE
    Stem Induced Fracturing Revisited

    By Uli Leiste

    Two papers are presented which examine Air Deck Blasting, one from a computational aspect and the other from a shock aspect.

    Jan 1, 2016

  • ISEE
    Exclusion Zone Optimization: Application of New Digital Technologies Allowing Ore Production

    By Jair Alarcón, Lucas Steffen, Leopoldo Muñoz

    Flyrock is one of the most significant hazards associated with blasting in open pit mining, especially for blasting operations near communities. Flyrock can lead to severe injuries, fatalities, and pr

    Jan 21, 2025

  • ISEE
    Mitigating Loaded Blast Patterns Buried Beneath a High Wall Failure

    By Aiden Carey, Jim Kennedy

    During December 2007, Lake Cowal Gold Mine located in New South Wales, Australia experienced a significant pit wall failure. The wall failure resulted in the deposition of a large quantity of saprolit

    Jan 1, 2011

  • ISEE
    Wave Analysis and Determination of Interference Times to Minimize the Impact of Vibrations

    By Carlos Pañura, Michael Geldres, Alejandro Rojas

    The vibration waves are produced by the detonation of the explosive charges of each blasthole, analyzing the vibration waves produced by each blasthole, allow us to determine the optimal time between

    Feb 1, 2020

  • ISEE
    Journal: Safety Talk / Accident Investigations / Lessons In Prevention for Blasting Safety Managers

    By Ann Barron

    Even though you think your company’s safety program is the best it can be, equipment, processes, supplies, surroundings and people do not always behave or react as expected. Consequently, needless acc

    Jan 1, 2007

  • ISEE
    Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic Velocities

    By M. Szumny, P. Mertuszka, K. Fuławka

    Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati

    Jan 1, 2024

  • ISEE
    Creating Micro Fractures in Rock Fragments for Blasting Efficiency Improvement

    By S. Green, R. Yang

    Blasting is a commonly used method for rock fragmentation in mining operations for mineral extraction. It involves breaking the rock mass into small pieces, and ideally creating micro fractures within

    Jan 1, 2024