Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: 100 Years / Scientific American New York December 2, 1911 The First National Mine Safety Demonstration Study Of A Real Mine Explosion By Charles L. Wright, Fuel Engineer, Bureau Of Mines

    By Robert Hopler

    THE work that is being done by the Government to reduce the dangers of mining was brought out strikingly in the First National Mine-Safety Demonstration which occurred at Pittsburgh, Pa., on October 3

    Jan 1, 2012

  • ISEE
    New Methodology in Measuring Experimental Results of Linear Shaped Charges Using Digital Software

    By Kevin Phelps, Jason Baird, Philip Mulligan, Dominique Nolan

    Determining the transitions from run-up to optimal cut length and optimal cut length to run down, without bias, from the penetration of a linear shaped charge (LSC) is difficult. The stresses applied

    Jan 1, 2013

  • ISEE
    Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill & Blast Engineering Focused Projects

    By Manuel Villalobos Calderón

    This paper presents the Enaex group approach to addressing the blasting challenges and outlines the solutions created. Aspects such as rock mass damage occurrence as a function of blast vibration freq

    Feb 1, 2020

  • ISEE
    A Proposed Test Program To Improve Explosive Risk Management

    By Lon Santis, Michael Swisdak, David Leidel, John Tatom

    The Institute of Makers of Explosives (IME) and A-P-T Research, Inc (APT) have developed and released a quantitative risk management tool, IMESAFR (IME Safety Analysis For Risk), for the commercial ex

    Jan 1, 2012

  • ISEE
    Removing Booster Influences from Toxic Fumes

    By Michael S. Wieland

    "This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is

    Jan 1, 1999

  • ISEE
    Preparatory Work Necessary to Establish Blastng Procedures on Buildings Damaged in Mexico City Earthquake

    By Alan Hooper

    This paper and slide presentation is a brief rundown on what is probably the worst natural devastation I have ever witnessed. The epicenter of the quake that so violently shook Mexico City occurred 23

    Jan 1, 1986

  • ISEE
    Burden Profiling: Do You Measure What You Think You Do?

    By Greg Shapiro, Paul Dr. Worsey

    Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,

    Jan 1, 2019

  • ISEE
    Reactivity and Spontaneous Detonation

    By Alastair Torrance, Italo Onederra, Do Sun Kim, Kush Patel, Gary Cavanough

    Reactivity of ammonium nitrate-based explosives is associated with the presence of sulphide in the ground reacting with explosive products and in some instances causing spontaneous reactions which can

    Jan 1, 2019

  • ISEE
    Fewer Surprises When You Measure the Sizes

    By Tom C. Palangio

    Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co

    Jan 1, 2016

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • ISEE
    Blasting for Wall Control and Stability using Electronic Detonators at the Bald Mountain Mine, Nevada

    By Kurt Oakes, John Williams

    Placer Dome, US operates the Bald Mountain Mine. The Bald Mountain Mine is a surface operation located in remote northwestern White Pine County in east-central Nevada, approximately midway between Elk

    Jan 1, 2004

  • ISEE
    Non-Electric Shock Tube and Optimizer Initiation Systems, Applications and Hookups

    By Tom Treleaven

    This guide presents numerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide quick reference by number of decks or bunch

    Jan 1, 1997

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006

  • ISEE
    Danger Tree Blasting In BC

    By Dave Weymer

    Falling timber in BC has always been a hazardous job. Huge, often rotting trees and steep, rugged terrain combine to create difficult and dangerous conditions. Death and injury rates are among the hig

    Jan 1, 2013

  • ISEE
    Close Proximity Blasting at the University of Georgia

    By Mick Fritz, Gregory Poole

    Construction blasting is always challenging when in close proximity to existing structures, but when you are next to a landmark like Sanford Stadium at the University of Georgia it can get intense. Bl

    Jan 1, 2011

  • ISEE
    Measurement of Pressure Variances

    By Jason Baird, Philip Mulligan, Caleb Baumgart

    This report details the pressure variances, measured at four pressure sensors placed equidistant from the center of an airburst explosion, as the blast pressure from a single charge expands radially.

    Jan 1, 2014

  • ISEE
    Blasting, Material Flow & Ore Dilution in Sublevel Cave Mining; State-of-the-Art Review

    By Ayman Tawadrous

    Cave mining offers a flexible technique to exploit large, low grade, deep ore bodies with low operating costs. It is typically done in either a top down approach; i.e. sublevel caving, or in a bottom

    Jan 1, 2015

  • ISEE
    Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast Hole

    By Lifent Li, Jhon Silva-Castro

    Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init

    Jan 1, 2015

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Underwater Blast Pressures From A Confinded Rock Removal During The Miami Harbor Deepening Project

    By Terri Jordan, Gregory Hempen, Thomas Keevin

    Water-borne blast pressures from confined blasts were recorded as part of a submerged blasting program in Florida for channel deepening. The blasting was confined within the rock floor by stemming. Sh

    Jan 1, 2007