Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blast Damage Predictions from Vibration Measurements at the SKB Underground Laboratories at ASPO in Sweden

    By Conny Sjoberg, Finn Ouchterlony, Bjorn Jonsson

    This contribution reports an investigation of the blasting damage in the contour of an access ramp to a Swedish underground laboratory for nuclear waste related studies. Near zone vibration measuremen

    Jan 1, 1993

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    Controlling Blast Vibration Effects with On-Site Analysis of Single Hole Signatures: "A New Approach"

    By Randall M. Wheeler

    Computer analyses of single hole signatures are often used to help blasting operators predict the type of ground vibration effects that may be produced from production blasts incorporating various del

    Jan 1, 1989

  • ISEE
    Vibration Control at Long Harbour

    By Michael Burrell

    This project involved the protection of an historic landfill located on the site. Construction blasting was for a permanent access road to carry traffic to and from a new metal processing plant being

    Jan 1, 2012

  • ISEE
    Blasting Specifications and Guidelines for Protective and High-Profile Blasting

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger

    Feb 6, 2023

  • ISEE
    "Journal: 100 Years / Mining & Scientific Press San Francisco April 10, 1909 / Methods of Testing Electric Detonators"

    By William Nicoll

    Those who use electric detonators in firing blasts will be interested in a new electrical testing instrument known as the ‘Blasters’ Friend’, recently devised by the New York Blasting Supply Co. of Ne

    Jan 1, 2010

  • ISEE
    Cold Detonation Physics: A New Field of Non-Toxic Nitrogen-Free Explosives

    By D. Swanson

    Cold Detonation Physics (CDP) is a patented new field of explosives and the name for the explosive that is produced when non-toxic dry ice (frozen carbon dioxide) is combined with powdered metals such

    Jan 1, 2024

  • ISEE
    Blasting Effects on Water Wells

    By D T. Froedge

    Before this study was started, literature was searched and cases of alleged water well damage were investigated. Occurrence of ground water in Appalachia is primarily in low yield, fractured, water ta

    Jan 1, 1983

  • ISEE
    Refinements in Blasting Practices at Minntac Mine

    By B Kniivila, A B. Andrews, T Lerick, Keith Jansen

    Minntac Mine is a large, open pit taconite mine located at the center of the Mesabi Iron Range in northern Minnesota. The planned development of the Mine in the direction of nearby communities prompte

    Jan 1, 1984

  • ISEE
    Shaking the Bugs at the Center for Disease Control [CDC]

    By Mick Fritz, Ryan Gilmore

    The Center for Disease Control [CDC] is in the midst of a twenty year project, part of which includes demolishing existing buildings and erecting taller, more modern structures within the same foundat

    Jan 1, 2008

  • ISEE
    The Didcot Demolition

    By R. Alford

    In the modern world of demolition safety is paramount and unnecessary or unquantifiable risks are not accepted (FasterCapital, 2024) and all risks must be kept As Low As Reasonably Practicable (ALARP)

    Jan 21, 2025

  • ISEE
    Journal: Vibration Control Through Better Predictions

    By Keith Best

    It has been said that when a person does something right no one remembers but when they do something wrong no one forgets. This statement, when applied to the explosives industry, has never been truer

    Jan 1, 2008

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Journal: 100 Years / Scientific American New York December 2, 1911 The First National Mine Safety Demonstration Study Of A Real Mine Explosion By Charles L. Wright, Fuel Engineer, Bureau Of Mines

    By Robert Hopler

    THE work that is being done by the Government to reduce the dangers of mining was brought out strikingly in the First National Mine-Safety Demonstration which occurred at Pittsburgh, Pa., on October 3

    Jan 1, 2012

  • ISEE
    A Proposed Test Program To Improve Explosive Risk Management

    By Lon Santis, Michael Swisdak, David Leidel, John Tatom

    The Institute of Makers of Explosives (IME) and A-P-T Research, Inc (APT) have developed and released a quantitative risk management tool, IMESAFR (IME Safety Analysis For Risk), for the commercial ex

    Jan 1, 2012

  • ISEE
    Tunneling in a Sensitive Environment

    By Scott Stephenson

    Making a tunnel through solid rock can sometimes be a dangerous task. Many things must be considered in order to complete such a task safely, and efficiently. Prior to starting things must be known su

    Jan 1, 2009

  • ISEE
    The Chemical Kiloton Experiment the Utilization of 50/50 Heavy ANFO at the Nevada Test Site

    By Don Larson, Gordon Coleman

    The United States Department of Energy, through its contractor Lawrence Livermore National Laboratory, has entered into a contract with Alpha-IRECO, Inc. for the emplacement of approximately 2.9 milli

    Jan 1, 1994

  • ISEE
    Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused Projects

    By Manuel Calderón

    Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high

  • ISEE
    Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried Mines

    By Damien Bretall, William Fourney

    Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro

    Jan 1, 2009