Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential StructureBy Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern
A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m
Jan 21, 2025
-
Mining Cost Optimization Strategy Based on Adaptive Blast DesignBy Huang Daguang, Paulo Couceiro, Juan Navarro
Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co
Feb 6, 2023
-
The Development of a UN/DOT and ATF Compliant Special Effects Explosives Transportation Packaging/Storage Magazine SystemBy Tassilo Baur
In the motion picture/television industry and to some extent in the entertainment industries in general, there is often a need to use energetic materials to create special effects as part of a product
Jan 1, 2009
-
Low Powder Factor Blasting to Take Advantage of Natural Rock Fissures is UneconomicalBy R. F. Favreau, Patrice Favreau
In many quarries and construction sites visited by the authors over the last 50 years, the latter have observed muck piles from blasting with explosives, which included numerous large blocks, in some
Jan 1, 2018
-
Drilling Cost Optimization by Using a Water-Powered Drilling Technique at an Underground Sublevel Stoping OperationBy Alexandra Yuyali
The objective of this research work is to increase the drilling ratio represented in tons per drilled meter (ton/m) to reduce mining costs. One of the key characteristics of this research is the use o
Jan 21, 2025
-
Blast design optimization system to improve mining downstream operations by adapting the explosive energy to the rock mass based on drill monitoring dataBy P. Couceiro, J. Navarro
A new methodology to perform selective blast designs by adapting the explosive energy, hole by hole (or in the hole), to the rock properties as a combination of their strength properties through the X
Jan 1, 2024
-
Preblast Surveys and a Look at Today's Seismographs: A General LookBy Randall M. Wheeler
Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a
Jan 1, 1992
-
Effect of Geology and Mechanical Properties of Rock on Blast ResultsBy Ph. D. Favreau, Favreau Patrice B. Eng, R. F.
Geology is important in mining by helping to identify the rocks which contain sufficient valuable ore to justify their excavation. Geologists give a geological name to each rock type, so geology is a
Jan 1, 2019
-
Bench Blasting Design Based on Analysis of Blast-Induced Ground Vibrations at an Open Pit Coal Mine in TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Serdar Celik, Yucel Karakus
This paper presents bench blasting designs based on results of vibrations analysis on test shots organized in an open pit coal mine located near to Soma district at Manisa province in Turkey. There ar
Jan 1, 2012
-
New Methodology for Calculating Dynamic PressureBy Jorge Cárdenas, José Luis Hurtado
The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar
Jan 21, 2025
-
The Effect of Selected Blasting Parameters on the Detonation Velocity of Bulk Emulsion ExplosivesBy Piotr Mertuszka
Many years of research on more effective and safer explosives have led to the development of emulsion explosives. They are the second most commonly used group of explosives worldwide, primarily becaus
Jan 26, 2026
-
Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial EstablishmentBy Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav
The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e
Feb 6, 2023
-
The Effect of Charge Mass and Delay Timing on Airblast OverpressureBy Adrian Moore, Dominic Hooton, Alan Richards
Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m
Jan 21, 2025
-
The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer
The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi
Jan 1, 2010
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock MinesBy Reinhold Daykin, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove
Feb 1, 2020
-
Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in CanadaBy Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit MineBy Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez
The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain
Feb 1, 2020
-
Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" DamBy Jennifer Williams, Donald J. Berger
Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of
Jan 1, 2014
-
Hole Diameter: Does it Affect Vibration Attenuation?By Tyler Acorn, Paul Worsey, Nathan Rouse
The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr
Jan 1, 2013
-
The Importance of Keeping Accurate Records Time TrailsBy Brad Bockey
Whether you are a driver, blaster, or are in charge of filing, you must recognize the importance associated with DOT-required recordkeeping. As various agencies become intertwined with rules governing