Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • ISEE
    Electronic Detonators Technology of the Future

    By Aloke Verma, R. Singh, S. Jana, C. Sawmliana, P. Pal Roy

    On July 21, 2004, a trial blast using electronic detonators was conducted in India for the first time in an opencast mine at Pundi-E Quarry of TISCO, West Bokaro. Orica-IEL conducted the test using el

    Jan 1, 2006

  • ISEE
    Explosives Properties and Characteristics

    By P D. Katsabanis

    According to Persson(1) steady state detonation along a cylindrical charge can be regarded as a self propagating process in which the axial compressive effect of the shock front discontinuity changes

    Jan 1, 1990

  • ISEE
    Test Study about the Law of the Action of Throw Blast Under Inclined boundary Conditions

    By Wang Hong Qu

    This paper observes the shape of throw explosion crater its ejecta locus of internal medium and the process of distance along with slope's angle developing. It was discovered that initial velocity is

    Jan 1, 1991

  • ISEE
    Blast Performance Analysis – Wavelet Transforms of Blast Seismograms

    By Doug Anderson

    Blast vibration seismograms are generally collected strictly for compliance with regulations. The peak levels (including dominant frequency) are typically all that are looked at. However, these record

    Jan 1, 2013

  • ISEE
    Six Pillars, Inventory Management & ATF Record-keeping

    By Ron Ketterling

    Donna Summer wrote and recorded a song in 1983 with Michael Omartian called, “She Works Hard for the Money.” The song was inspired by her encounter with an exhausted rest room attendant, Onetta Johnso

  • ISEE
    Environmentally Motivated Tracking of Geologic Layer Movement During Bench Blasting Using Discrete Element Methods

    By Dale S. Preece

    The blast-induced movement and final location of geologic layers that may cause environmental problems can be predicted using discrete element methods. This prediction capability can be used by mine o

    Jan 1, 1994

  • ISEE
    Near-Source Observations from Signle and Multiple Cylindrical Explosions in a Coal Mine

    By Xiaoning Yang, C David Pearson, Brian W. Stump

    An experimental study of ground motion from explosions designed to remove overburden in an open pit coal mine is reported. The purpose of this study is a characterization of these ground motions in th

    Jan 1, 1994

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • ISEE
    Physical Interpretation of Free-Surface Ground Motions from Chemical and Nuclear Explosions: (Operational and Synthetic Seismograms)

    By Brian W. Stump

    "Seismic waves from explosions can be used to characterize physical processes in and around the source. The quantification of absolute levels of ground motion is important for minimizing impact on nea

    Jan 1, 1990

  • ISEE
    Dynamic Stress Field around a Blast Hole – A Laboratory Study

    By R. Raghavaraju

    Estimation of the dynamic stress field in terms of its amplitude and decay around a blast hole is a key input parameter in all numerical modeling and blast prediction exercises. However, there is very

    Jan 1, 2014

  • ISEE
    Blasting Problems Facing the USA Quarry Industry

    By Victor C. Bryan

    "One of the more challenging issues facing operators of U.S. mines and quarries is blasting in an environmentally acceptable way. It is quite important that industry management understand and apply gu

    Jan 1, 1995

  • ISEE
    Modeling of Special Blast Geometries from Open Pit to Underground

    By Dale S. Preece, Stephen H. Chung

    Explosives energy can be used effectively in breaking and displacing large volumes of rock in mining and quarrying industries in both open pit and underground. The blast result, however, may not be ec

    Jan 1, 2005

  • ISEE
    The Use of Computer Based Blasting Models in Mine Feasibility Analyses (d77e0f44-d5f8-4a76-8875-d772b7b19692)

    By George Boucher, Simon Williams, Neil McBride

    "The aim of these analyses was to utilise the latest available production information for the Wandoooperation to determine the optimal blasting parameters, costing’information and predicted results(fr

    Jan 1, 1998

  • ISEE
    Blasting and Comminution Choices for the Management of the Mining Business

    By Alexandre Passos, Giorgio De Tomi, Tatiane Marin, Dennis Cremonese, Jacopo Seccatore

    "In the mining industry, rock excavation is the first phase of the comminution process. Downstreamoperations such as secondary breaking, crushing and milling terminate the process, reducing the size o

    Jan 1, 2016

  • ISEE
    Use of Signature Hole Analysis for Blast Vibration Control at the Highvale Mine

    By Ron J. Elliott, Dylan Wedgewood

    A series of five signature holes were blasted at the Highvale Mine and the resultant seismic data was analyzed to make recommendations on how best to address neighbour complaints regarding blast vibra

    Jan 1, 2018

  • ISEE
    Blast Modeling with Sabrex 3.5 and Its Applications to Improve Mine Productivity

    By Stephen H. Chung

    The blasting performances identified above are considered to be the most practical ones for judging the effectiveness of a design combining explosives / rock / drill pattern. In a total blast design p

    Jan 1, 1994

  • ISEE
    Pre-Blast Surveys; a Public Relations and Claim Reduction Tool (b114a2f5-7740-4145-afd2-f7ffc2af0fcd)

    By David Harrison, Edward J. Walter, Meitra Ferek

    Agreat tool in the prevention of blasting complaints and subsequent damage claims. In today’s highly competitive industry, we are always looking for ways to become more cost effective. This article in

    Jan 1, 1995

  • ISEE
    Prediction of the Ground Vibration Attenuation Induced by Blasting for the Different Rock Masses

    By A. Karadogan, G. Tuncer, A. Kahriman, S. Gorgun

    This paper presents the results of ground vibration measurements induced by blasting operations at five different sites located close to the residential areas. Within the scope of this study, ground v

    Jan 1, 2003

  • ISEE
    Blast Design and Management Software, and Overview of the Professional Blast Manager

    By Ron Beeslaar, Tony Rorke

    The Professional Blast Manager is a blast design tool that has been developed in South Africa. It is aimed at mining and civil engineen, blasting contractors and mine planning engineers. The code can

    Jan 1, 1998