Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM Models

    By Alejandro Ferrada Vergara, Héctor Espinoza Muñoz

    Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ

    Jan 1, 2016

  • ISEE
    Quantifying Your Blast Fragmentation Using Split-Desktop

    By Kirstin Girdner, Tom BoBo, Brian Norton, John Kemeny

    Split Engineering is a truly customer oriented company dedicated to providing quantified fragmentation information of the highest integrity to enable process management and control. Technical decision

    Jan 1, 2000

  • ISEE
    Influence of Distance in the Effective Use of Electronic Detonators to Control Blast Induced Ground Vibrations

    By W. J. Birch, R. Farnfield

    The use of electronic detonators to control blast vibrations has been previously established by many authors. This is performed by determining the optimum delay period between the blast holes for a pa

    Jan 1, 2009

  • ISEE
    Response of Pressurized Pipelines to Production - Size Mine Blasting

    By Mark S. Stagg, David E. Siskind

    The mining industry occasionally blasts near pressurized transmission pipelines and has requested guidance of safe vibration levels and setback distances. the Bureau of Mines and the Indiana Departmen

    Jan 1, 1996

  • ISEE
    Momentum Theory – A New Calculation of Blast Design and Assessment of Blast Vibrations

    By Robert Boehnke, Bernd Mueller

    Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation

    Jan 1, 2003

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • ISEE
    Interpreting the Accuracy and Validity of Seismograph Recordings

    By John E. Wiegand

    "We will attempt to explain the basic workings of a modern seismograph and how the recorded data can be interpreted, not only for determining compliance to the regulations, but also in determining whe

    Jan 1, 1992

  • ISEE
    Journal: History of ISEE – Timeline / 35 Years

    1974 The Society of Explosives Engineers officially formed to “advance the art and science of explosives engineering” on August 20, 1974 in Pittsburgh, Pennsylvania.

    Jan 1, 2010

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016

  • ISEE
    A Study of the Use Signature Holes for Smaller & Faster Moving Construction Blasting Operations

    By Dale Bartholomae, David Harrison, Edward J. Walter

    Methods that involve the use of signature blast holes in order to identify the particular frequency characteristics of a geographical area are widely available. Information acquired can be used to det

    Jan 1, 2005

  • ISEE
    Measuring Blast Movement to Reduce Ore Loss and Dilution

    By Darren Thorton, David Sprott, Ian Brunton

    Blasting causes movement of the rock and can be detrimental to the accurate delineation of the ore and waste regions within the resulting muck pile. The consequences can be ore loss and dilution. Howe

    Jan 1, 2005

  • ISEE
    Vibrations from Seismic Exploration Blast

    By David Siskind

    The authors studied small seismic exploration blasts for vibration characteristics and effects on structures in Mexico. Obtained were 267 three-component recordings of ground vibrations and structure

    Jan 1, 2002

  • ISEE
    Laser Profiling and Computer Aided Blast Design using the New Criterion Survey Systems and Analysis Software

    By Steve Colburn

    The new CRITERION Survey Systems utilize both theodolite mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh environment

    Jan 1, 1995

  • ISEE
    Laser Profiling and Computer Aided Blast Design using the Criterion Survey System and Win-Profile Analysis Software (b3a04a88-253a-4339-a3ec-70b988aee07d)

    By Steve Colburn

    The CRITERION Survey Systems utilize both theodolite mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh environments ch

    Jan 1, 1997

  • ISEE
    Impact Mine Blasting on the Environment of Quarry Operation (Neighbou Perception and Operator Dutie)

    By G. Gomez Ciments-Calcia

    The sources of complaints by neighbours of the operating quarry are due to the 3 following causes : - Impulsional noises or air hoch wawes – Vibrations - D u s t How a blasting in a quarry operation i

    Jan 1, 2002

  • ISEE
    Blast Designs and Controls in Steeply Dipping Coal Seams

    By Ricardo Gaviria, Vincinte Acosta

    There are major blast design and field procedures differences between conventional blasting in horizontally bedded coal seams and blasting underneath coal seams in a multi seam deposit with seam incli

    Jan 1, 1995

  • ISEE
    Journal: Safety Talk / Every Number Tells A Story

    By Paul Downing

    A typical day for a blasting company includes what seems to be an infinite list of tasks dealing with numbers. Whether determining the exact amount of explosives material in inventory, the number of h

    Jan 1, 2008

  • ISEE
    Bench Face and Quarry Fragmentation Analysis: 3D Imaging vs. Scaling References

    By Daniel Ko, Ian Bell, Shahram Tafazoli, Bahram Sameti, Aylin Azmin

    Image-based remote sensing of rock fragmentation in mining and quarry applications essentially treats each rock in the image as a data object in order to determine the rock size distribution. An obvio

    Jan 1, 2015

  • ISEE
    Crystal Falls Dam Demolition and Protection Techniques Using an Air Curtain

    By Alex Chapman, Cam Thomas, Bryan Karney

    "During the early summer of 1989, Ontario Hydro removed a concrete portion of the North Channel Dam at Crystal Falls Generating Station by blasting and excavating in marine conditions. Because of the

    Jan 1, 1992

  • ISEE
    The Laws Governing Blasting

    By Scott Orenstein

    Construction blasting has allegedly been the cause of property damage in the following situations: (1) When the detonation of the shot hurls rock and debris into the air that causes property damage up

    Jan 1, 2004