Foundation Design And Construction Challenges For The Phoenix Sky Train ProjectBy John C. Niedzielski
The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill
Jan 1, 2010
-
Modelling For Consolidation Around The Pile TipBy Emöke Imre
A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical
Jan 1, 2002
-
Construction Technique Used To Build The Drilled Shafts For The Victory BridgeBy T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005
-
Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, ColoradoBy Kyle Kershaw
Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty
Jan 1, 2007
-
Determination Of Pile Lengths Under Existing StructuresBy Mohamad Hussein
Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b
Jan 1, 1992
-
Permanent Displacement And Pile Driving Vibrations - SummaryBy Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1997
-
The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining StructuresBy Barry C. Slocombe
The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in
Jan 1, 2008
-
Maritime StructuresBy D. Waite
The Chairman opened the session by wondering why so few papers on Maritime Structures had been received for this conference. Perhaps because the marine environment is so hostile and the access so diff
Jan 1, 1991
-
The Merits Of Polymeric Fluids As Support SlurriesBy J. J. Beresford
The primary function of a support slurry is to provide stability during excavation. Today foundation structures can be designed around the additional friction afforded by the absence of the filter cak
Jan 1, 1989
-
Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? IntroductionBy D. Arentsen
Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin
Jan 1, 1987
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. IntroductionBy John Lemke
Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin
Jan 1, 2002
-
Discussion On Base Grouted PilesBy V. M. Troughton
Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim
Jan 1, 1991
-
Reverse Circulation Drilling (Rcd) Technology For Largediameter PilesBy Nikolas Schmitz
For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling
Nov 1, 2022
-
Newtown Creek Pile Foundation Work 2009By Thomas Trochalides
Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity
Jan 1, 2010
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
Innovative Deep Foundation Support Using Ductile Iron PilesBy Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi
"Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site
Jan 1, 2016
-
An Analysis of LRFD for Helical AnchorsBy Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Terminology and Evaluation Criteria of Crosshole Sonic Logging (CSL) as applied to Deep FoundationsBy Greg Canivan, Bernie Hertlein, Les Chernauskas, Joram Amir, Garland Likins, E. Anna Sellountou, Tim Kovacs, Peter Kandaris
Nondestructive testing of drilled shaft foundations via Crosshole Sonic Logging (CSL) is often performed as part of the quality assurance process to assess the soundness of concrete. The intent of CSL
Jan 1, 2019