    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2005

  • DFI
    The Effect of Arching Pressure on a Vertical Circular Wall

    By Sangseom Jeong, Kyoungyul Kim, Jaeyeon Cho

    "Abstract The lateral earth pressure of vertical circular shaft is investigated by using experimental tests and a theoretical analysis. The emphasis was quantifying on the magnitude and distribution o

    Jan 1, 2014

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters

    By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula

    "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat

    Jan 1, 1900

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test Data

    By Ramin Motamed, Joseph A. W. Toth

    Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte

    Jan 1, 2018

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    In Luxembourg-Walferdange 2 Problems Concerning The Geodynamic Motions Of The Planet Earth Are Studied Since 1963 - A) The Earth Tides

    By experience we know about the natural event of ocean-tides. In geophysics we say that the earth-tides phenomenon is the elastico-viscous response of the earth's body to the attraction potential

    Jan 1, 1987

  • DFI
    Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia

    By Chandrasegaran, Tamilmani

    "This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part

    Jan 1, 2015

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    Monitoring Auger Cast In Place Pile Construction And Testing In Hard Clay

    By C. Vipulanandan

    Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing

  • DFI
    Displacement Dependent Stiffness And Damping Constants Of Pile Groups

    By Shamsher Prakash

    Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is

    Jan 1, 2002

  • DFI
    Statnamic Load Testing Of Strain Instrumented Large Diameter Bored Shafts - Synopsis

    By Matthew Janes

    Statnamic load testing is becoming widely accepted as a method to quickly and economically determine the load-deflection behaviour and ultimate static resistance of high capacity deep foundations. Str

    Jan 1, 1996

  • DFI
    Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.

    By Sudhir Kumar Das

    "The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted

    Jan 1, 2015

  • DFI
    Lateral Pile Load Testing Under Cyclic Loads

    By Dan Brown

    This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed

    Jan 1, 2003

  • DFI
    Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications

    By William S. Heckman

    a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and

    Jan 1, 1997

  • DFI
    Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation

    By James R. Gingery, Byron Foster, Bret Lingwall

    While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th

    Sep 8, 2021