Experiences Of The Cast-In-Situ Pile Filling In Stone-Line IntercalationBy Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case HistoryBy Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Minipiles And Jet-Grouting: A Strong Foundation In Parma, ItalyBy Bruno Gemmi
The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid
Jan 1, 2011
-
Innovative Design At Lake LenexaBy Jacques Moraille
The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for
Jan 1, 2009
-
I-470 Mine RemediationBy Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo DamBy Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Pin Piles For Seismic Rehabilitation Of BridgesSince the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Evaluation Of The Originally Published, Meyerhof Empirical Correlations Of Shaft Friction And End Bearing Capacity For Driven Piles Using Dynamic Test DataBy Karl A. Higgins
In 1976, Prof. G. G. Meyerhof published a famous article in the Journal of Geotechnical Engineering titled ?Bearing Capacity and Settlement of Pile Foundations?. This article presents the authors opi
Jan 1, 2011
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Experiences With A New Type Of Displacement Screw Pile - SynopsisBy William Van Impe
A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a
Jan 1, 1996
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case HistoryBy Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero
"SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m
Jan 1, 2014
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - SynopsisBy Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? SynopsisBy A. K. C. Chan
Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460
Jan 1, 2010