Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of PilesBy Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002By Colin Curtis
The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an
Jan 1, 2002
-
Collaborative Development of Sustainable & Economical Solutions for Underground StructuresBy Abid Adekunte
"Whilst safety is considered to be of high priority in every aspect of engineering projects, it is equally important for designers and contractors to be continually aware of their obligations to the i
Jan 1, 2017
-
New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable SoilsBy Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain
"An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i
Jan 1, 2015
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial DepositsBy John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane TestsBy John Erikson, Alan J. Lutenegger, Nicholas Williams
"In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida
Jan 1, 2017
-
Helical Piers with Grouted Shafts -A Case HistoryBy Jr. D'Angelo, Michael M. Blendy, Shawn Downey
"A grouted helical pile was used to support new buildings in the reconstruction of a large residential development. Foundation options were complicated by urban fill underlain with variable alluvial s
Jan 1, 2005
-
New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and LogisticsBy Max Gwynn, Tony Suckling
"The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.
Jan 1, 2008
-
Metro Sao Paulo, Line 5, Five Shaft Diaphragm Wall for Brooklin StationBy Dario Libano, Franz-Werner Gerressen
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barrie
Jan 1, 2017
-
Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration ResistanceBy Glen Mann, H. G. Vestberg, Robert D. Holtz
"Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically
Jan 1, 2005
-
Using Settlement-Control Piles To Enhance Mat Foundation Of A High-Rise Building In OrlandoBy Amr M. Sallam
A case history of utilizing a mat foundation enhanced with ?settlement-control? piles to support a high-rise building in Downtown Orlando is presented. Original geotechnical engineering studies, perf
Jan 1, 2009
-
Session 17 "Grout for Enhancement of Piles and Piers"By Dennis Wrixon
It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement
Feb 10, 2003
-
Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified OverburdenBy Michael J. Marasa
"Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal
Jan 1, 2017
-
Evaluation Of Existing P-Y Models For Caliche Based On Numerical Analysis Of Raiders Stadium Lateral Load TestsBy Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Numerical lateral load analysis based on the beam on Winkler foundation (BNWF) model (i.e., the p-y method) is a simple, and widely used tool to predict lateral responses of drilled shafts from field
Oct 1, 2022
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And CoolingBy Peter Smith
One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons
Jan 1, 2010
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling TechniquesBy Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Confined Space And Inner-City Projects – Future Challenge And Opportunity For Diaphragm WallingBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. One can anticipate that globa
Nov 1, 2022