Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    Toward the Inventory of Ontario?s Mineral Aggregates

    By W. R. Cowan

    The availability of mineral aggregates for construction purposes is rapidly declining through inadequate resource planning. restrictive zoning and legislation , and competing land uses. The Geological

    Jan 1, 1978

  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • CIM
    A Re-Examination of the Sacred Cows in the Sart Process

    By M. Melashvili

    "The SART Process was introduced to the gold mining industry in the late 1990s and several commercial plants were built over the following 10 to 15 years. Most of these plants have operated well and e

    Jan 1, 2016

  • CIM
    Prospects for the Canadian uranium industry

    By O. J. C. Runnalls

    "Canada became the world's largest uranium producer in 1984. That leadership position is likely to be maintained for many years into the future because of a firm production base, many undeveloped

    Jan 1, 1988

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines Limited

    By G. Halverson, K. Blower

    "Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per

    Jan 1, 1987

  • CIM
    Development of Emiprical and Numerical Design Techniques in Burst Prone Ground at Goldcorp Inc.?s Red Lake Mine

    By Pravin Kumar

    Goldcorp Inc.?s Red Lake Mine (RLM) is situated in the Red Lake Mining District, a history rich North Western Ontario mining community. Red Lake Mine formerly known as the Dickenson Mine has experienc

    May 1, 2002

  • CIM
    Pressure Acid Leaching of Non-Ferrous Smelter Slags for the Recovery of Their Base Metal Values

    By W. Curlook, V. G. Papangelakis, M. Baghalha

    A pressure acid leaching process has been developed for the extraction of metal values, nickel, copper, cobalt and zinc, from base metal smelter slags. The basic concept contemplates cooling the smelt

    Jan 1, 2004

  • CIM
    The Effect of Grinding Media Performance on Milling and Operation Behaviour

    By Don Langlois, Udo Weber

    "The effect of grinding media performance on milling and operational behaviour was demonstrated under different selected milling conditions of calcium carbonate. A variety of grinding media material a

    Jan 1, 2009

  • CIM
    American Barrick Goldstrike Operation in Elko Nevada - A Summary of the Operation and Future Expansions

    By R. H. Colquhoun, A. W. Bolland, H. J. H. Pieterse

    "American Barrick Resources Corporation acquired the goldstrike property in north eastern Nevada in early 1987. Since that time, the company has undertaken an extensive development program. This paper

    Jan 1, 1992

  • CIM
    The Role of Flotation in the Recovery of Gold

    By I. Jackman

    "Gold is present in different forms and associations in different ores. Flotation is used to recover gold and minerals associated with gold, but the applicability and type of flotation vary. The purpo

    Jan 1, 1995

  • CIM
    Challenges in moving from Ad-Hoc to Planned Mine Technology Innovation

    Why Innovate in Mining? ?Obvious, right? ?Increase productivity and profitability ?Improve safety and ergonomics ?Improve our environmental record and eliminate liabilities ?Implement process c

    May 1, 2006

  • CIM
    Application of work renovation planning and systems performance training at Rio Algom's Stanleigh operations

    By Allan A. Este, Bruce Arthur

    "Rio Algom's Stanleigh Mine and Mill Operation Was' officially started up in August 1983. In September 1982, Rio Algom contracted Estonix International Inc. from Lively, Ontario, to develop

    Jan 1, 1993

  • CIM
    Progress on Stainless Steel as Bipolar Electrode Plate Material for PEM Fuel Cells

    By R Zavadil, S Kuyucak, F Fazeli

    Proton exchange membrane (PEM) fuel cells generate electricity by reacting hydrogen and oxygen. A thin, bipolar electrode material provides a medium for electron exchange with the electrolyte, alterna

    Jan 1, 2014

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004