Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Slope failure kinematics

    By Z. M. Zavodni, C. D. Broadbent

    "Major rock slides in open-pit mines are rare, but they can develop in spite of sophisticated slope engineering design practice. Experience has shown that, except under high seismic load conditions, t

    Jan 1, 1980

  • CIM
    Process Alarms: A Real Time Decision Tool

    By Marc Tardif

    "The way alarm information is provided to an operator can make a huge difference in the minutes following an upset. Process alarms are often looked at as a way to help avoid catastrophic failure and s

    Jan 1, 2016

  • CIM
    Simulation of Methane Distribution and Ventilation in Underground Mines: Potential for a Novel Intermittent Airflow System

    By J. C. Kurnia

    Methane is recognized as one of the prime causes of underground mine disasters around the globe. A cost-effective mine ventilation system and methane control is required to ensure a safe and productiv

    Aug 1, 2013

  • CIM
    Potash Ore Flotation Mechanism: Amine Molecules Adsorption or Amine Particles Attachment?

    By E. Burdukova

    Long-chain primary amines are utilized as collectors in potash ore flotation. Krafft temperature of long-chain amines in brine is about 100 °C, and this makes such amines practically insoluble in brin

    Jan 1, 2009

  • CIM
    Technology transfer and acceptance key to increased productivity in oil sands mining

    By R. K. Singhal

    "On the mining side the Canadian oil sands industry has become proficient in excavation and disposal of ore and overburden. Nearly twenty years of mining experience is now behind this industry. While

    Jan 1, 1989

  • CIM
    Iron Removal from the MCLE Circuit

    By H. Higuchi

    The Sumitomo Metal Mining Company Ltd. (SMM) started to produce electrolytic nickel at the Niihama Nickel Refinery in 1939. In 1992, the conventional matte electrorefining process was converted to the

    Jan 1, 2006

  • CIM
    The release of vanadium from Athabasca oil sands cokes by leaching techniques

    By J. E. Zajic, E. A. Sullivan, T. R. Jack

    "The release of vanadium, iron, nickel and titanium from the cokes produced in the upgrading of Alberta oil sands bitumen has been assessed for simple chemical leaching processes. Flexicoker coke (Exx

    Jan 1, 1980

  • CIM
    De-Leading a Copper Concentrate

    By Peter S. Jack

    "IntroductionTHE ORES treated at the concentrator of the Britannia Mining and Smelting Company, Limited, Britannia Beach, B.C., have always contained some lead, but it was not until 1950 that the comb

    Jan 1, 1953

  • CIM
    Integration of Robotics and Automation in Mine Design, Planning, and Optimization

    By J. Suarez

    The innovation initiatives for world-class mines today and in the future focus on automation and robotics in equipment and machinery. These innovations have benefited from the development of advanced

    Aug 1, 2013

  • CIM
    The Acid Plant Expansion and Energy Saving at Toyo Copper Smelter

    By N. Kubo

    Sumitomo Toyo Copper Smelter and Refinery was commenced in 1971, and its production capacity of sulfuric acid was 550tpd at the beginning. In 2001 Toyo Copper Smelter and Refinery projected to expand

    Jan 1, 2007

  • CIM
    Fabrication of In-Situ Aluminum-Alumina Composite

    By M. Meratian

    The in-situ methods have been developed in production of aluminum matrix composites. A commonly adopted in-situ method involves reaction between a metal oxide and aluminum to produce alumina particles

    Jan 1, 2007

  • CIM
    Inco roast-reduction smelting of nickel concentrate

    By C. Díaz, A. D. Dalvi, C. E. O'Neill

    "Roast-reduction smelting (RRS) of nickel concentrate, combined with flash smelting of copper concentrate, was one of the process options that Inco considered as a means of meeting its 1994 sulphur di

    Jan 1, 1994

  • CIM
    TOUGH-UDEC Simulator for the Coupled Multiphase Fluid Flow, Heat Transfer, and Deformation in Fractured Porous Media

    By J. Lee, K. B. Min, J. Rutqvist

    Shear slip of fractures in fractured rock masses is a critical issue for many geological engineering applications, such as the design of underground nuclear waste repositories, enhanced geothermal sys

    Jan 1, 2015

  • CIM
    Integrated Condition Monitoring: The Future Direction of Predictive Maintenance Strategies

    By William H. Emling

    With profitability pressures in heavy industry increasing, many producers are turning to predictive maintenance as a means of harvesting untapped value from their production assets. Corporations are l

    May 1, 2001

  • CIM
    An analysis of AL-60 airleg maintenance data

    By R. Frank Chiappetta, E. B. Wilson

    "The maintenance records for AL-60 airlegs at Falconbridge Ltd. are used to demonstrate some of the procedures for the analysis of such data.The data are not representative of pure failure s of one ty

    Jan 1, 1985

  • CIM
    LIFAC - economical solution to SO2 control

    By D. W. Smith, J. J. Koskinen, T. A. Enwald, M. E. Ball

    "A full-scale demonstration unit of Tampella's LIFAC desulphurization process was tested at SaskPower's Poplar River Power Station Unit No. I. The test program included a series of parametri

    Jan 1, 1993

  • CIM
    The Effect of Particle Size on Froth Stabilities of Different Ores

    By B. McFadzean, I. Achaye, T. Chidzanira, J. Wiese

    "Froth stability has an overriding effect on metallurgical recovery and grade for many ore types. Froth recoveries of less than 10% are common for low stability froths such as those in sparsely minera

    Jan 1, 2016

  • CIM
    Recovery of Selenium from Acid Plant Reverse Jet Scrubber Sludge in Copper Smelting

    By Chandrakala Kari, Divyang Shah, Lakshmi Kanth Reddy, Kaushik Vakil, Sanjay Sarkar, Bhavin Desai

    Gases rich in sulfur dioxide generated as a by-product of smelting and converting operations of copper concentrate contain selenium apart from zinc, lead, copper, cadmium, bismuth, antimony, and arsen

    Jan 1, 2019

  • CIM
    The design and installation of a mine monitoring and control system

    By D. Lauzon, H. de Ruiter

    "In 1988a decision was taken to design and install a computerized mine monitoring and control system. This system had to monitor and control all pumping and ventilation underground. The operation of t

    Jan 1, 1991

  • CIM
    BILMAT on Microcomputers: A Powerful Material Balance Algorithm in a User-Friendly Environment

    By D. Laguitton, D. Cimon

    "BILMAT is one of the most powerful algorithms in existence for material balance computation in mineral processing flowsheets. It is based on a hierarchical decomposition coupled with the Lagrange mul

    Jan 1, 1989