    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    A Review of the Geology of Gold in Nova Scotia

    By Milton C. Graves, Marcos Zentilli

    "Gold has been reported from most geological environments in Nova Scotia; however, virtually all production (circa 2,000, 000 troy ounces; circa 60 tonnes) has come from that part of the province to t

    Jan 1, 1982

  • CIM
    Product stewardship at Dofasco: A discussion paper

    By B. W. Steele

    "Dofasco began operations in 1912 as a steel foundry located in Hamilton, Ontario. Today, Dofasco is a fully integrated mill that manufactures hot rolled, cold rolled, galvanized and tinplate steels.

    Jan 1, 1996

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    Recent Developments of Laser-Induced Breakdown Spectroscopy for Real-Time Measurement and Control of Mineral Processing

    By Alain Blouin, Mohamad Sabsabi, Aissa Harhira, Paul Bouchard, Greg Lithgow

    "The objective of this study was to demonstrate the application of Laser-Induced Breakdown Spectroscopy (LIBS) to the continuous analysis of online monitoring of Al, Mg, Ni, Mn, Si and Fe in nickel or

    Jan 1, 2016

  • CIM
    Noranda Minerals Inc. - Geco Division Mill Pressure Filter Project Selection, Installation and Start-Up

    By M. G. Dellow, D. W. Hendriks

    "In early 1988 the decision was made by Noranda Minerals Inc. to install pressure filters at the GECO mill to replace the vacuum disk filters and bunker-C fired rotary kiln dryers. Two filters were in

    Jan 1, 1990

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    The use of near surface materials in gold exploration Kirkland Lake area, Ontario

    By V. N. Rampton, C. F. Gleeson

    "Exploration results over three overburden drilling anomalies defined by the Ontario Geological Survey in 1981 in the Kirkland Lake area, Ontario are presented. The anomalies come from lowland areas w

    Jan 1, 1987

  • CIM
    Residence time distributions modelling for mineral processes evaluation

    By C. Bazin, D. Hodouin

    "A flexible model involving perfect mixers, stagnant zones, plug flow, material bypassing and recycling zones has been developed for interpreting mixing phenomena in mineral processes. The mixing prop

    Jan 1, 1988

  • CIM
    Testing of Cycloflotation Process

    By Turgut Yalcin

    "Recent years have seen a resurgence of interest in flotation cell design, and one of the areas where attention is being focused is flotation in centrifugal fields which aims at increasing the flotati

    Jan 1, 1994

  • CIM
    Use of an on-Line Analysis System in the Flin Flon Concentrator

    By H. A. Dakin

    "An introduction to the metallurgical requirements of the Flin Flon concentrator reveals the magnitude of ore blending which is required in its operation of three flotation circuits. The resulting var

    Jan 1, 1974

  • CIM
    Geomechanical feature extraction and analysis using LiDAR data: Iron Ore Company of Canada mine

    By D. J. Hutchinson, M. Lato, M. Diederichs

    Light Detection and Ranging (LiDAR)-based applications for geomechanical purposes have recently proven to be a highly reliable and accurate form of remote analysis and documentation. The ability to re

    Jan 1, 2009

  • CIM
    Dense Medium Separation – An Effective and Robust Pre-Concentration Technology

    By Erin Legault Seguin, Mike Rylatt, Curtis Mohns

    "With energy costs increasing and ore grades diminishing, the role of pre-concentration in hard rock mining operations has been gaining greater interest. To maximize energy conservation, the pre-conce

    Jan 1, 2016

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • CIM
    Arching Effects and Sillmat Behaviour

    By Euler De Souza

    This paper presents a study conducted to assess sillmat behaviour during undercut mining and to provide a comprehensive understanding of the effects of arching and sillmat thickness on stability. The

    May 1, 2002

  • CIM
    Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-

    By Jason J. Crowder

    Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a

    May 1, 2006

  • CIM
    Geology at the Argosy old Mine, Casummit Lake, Ontario

    By H. C. Horwood

    INTRODUCTION THE Argosy Gold Mines, Limited, which joined the ranks of active Ontario gold producers during the summer of 1936, holds a group of 21 claims on Casummit lake, in the Patricia portion,

    Jan 1, 1937

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Human Aspects of Automation - The Diamond Drilling Case Study

    By Helen Francis

    Over the last decade, lower ore grades and deeper mine environments have demanded that mining companies develop new technologies (tools and processes) to ensure a mine?s economic sustainability. At In

    May 1, 2002