Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    “Over the Hills and Far Away” Long Distance Slurry Pipelines in Mountainous Regions

    By Donald J. Hallbom

    "While pipeline hydrotransport is often the most economical way to transport large volumes of mineral concentrate, tailings, or fine ore slurry over long distances, it is in mountainous terrain that p

    Jan 1, 2006

  • CIM
    Process Safety Management

    By Ertugrul Alp

    Alp & Associates - Who We Are ?? Canadian consulting company (1999-?) ?? Principal Consultant: Dr. Ertugrul Alp, P.Eng. ?? Over twenty-five years experience serving the chemical, mining, pulp & pap

    May 1, 2008

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    Application of Automatic Sampling in the Mineral Processing Industry

    By Paul H. Atkinson

    "Sampling in the mineral processing industry has always been a subject which has received considerable discussion. There have been many volumes written on theory, techniques and practical application

    Jan 1, 1976

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • CIM
    Gold Potential of a Hidden Archean Fault Zone: The Case of the Cadillac-Larder Lake Fault

    By O. Rabeau, M. Legault, A. Cheilletz, L. Z. Cheng, J. J. Royer, M. Jébrak

    "By compiling geological, structural, geophysical, and geochemical information into a 3D geological model, we evaluated the orogenic gold potential in the vicinity of a hidden segment of an important

    Jan 1, 2009

  • CIM
    Burr Project Potash Mine Development

    Burr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth

    May 1, 2009

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004

  • CIM
    Hydrogeological Aspects of Three Open Pits within Noranda Operations

    By L. C. St. Arnaud

    "Open pit mines can produce large disturbances within regional hydrogeologic systems. The degree of disturbance and the consequences on the local environment depend on the size of the pit and on the p

    Jan 1, 1990

  • CIM
    Green Supply Chain Management: A Future Need For Mining And Mineral Industry

    By D. P. Tripathy

    A supply chain encompasses all the activities associated with the flow and transformation of goods from the raw materials stage(extraction), through to the end user. Supply chain management (SCM) is t

    May 1, 2006

  • CIM
    An Investigation on Processing Characteristics of Gold Ore Samples from Barry Deposit, Quebec

    By S. Kelebek, E. Yalcin

    "Two composite samples of a gold-bearing ore from North Western Quebec (Barry Township) were tested to assess their grindability, recovery by flotation and Knelson concentrator as well as extraction u

    Jan 1, 2008

  • CIM
    Analyzing Energy Consumption and Gas Emissions of Loading Equipment in Underground Mining

    "In an environment of rising energy prices and mining at greater depths, cost-efficient loading and hauling equipment is essential. Conducted at an underground mining operation, this study analyzes th

    Jan 1, 2015

  • CIM
    An Overview of the Oil Sands Process, Comparing it to Conventional Mineral Processing

    By Gavin Ritson, Chris Ward

    "The oil sands industry is still fairly young with the first viable oil sand operation having been started in Alberta in 1960. Since then numerous modifications and improvements have been tried and im

    Jan 1, 2009

  • CIM
    State of Leadership in the Mining Industry and Why Leadership Matters

    By Scott Martin

    This paper will discuss the challenges currently facing the mining industry. By sharing experiences gained in the CIM Leading in Mining Course, I will highlight what’s working, what’s not, what are th

    Jan 1, 2014

  • CIM
    Chemical Modelling Of The Fe2(SO4)3–FeSO4–H2SO4–H2O System

    By J. D. T. Steyl, C. A. Biley

    "The chemistry of electrolyte systems containing iron remains generally poorly understood despite their prevalence in many natural and industrial processes, particularly in hydrometallurgy. These syst

    Jan 1, 2016

  • CIM
    Barrick Gold Corporation - Est Malartic

    By Pierre Pelletier, Christian Pichetie, Dany Pelletier

    "IntroductionDuring 1994, Barrick Gold Corporation, or American Barrick at that period, acquired Lac Minerals Ltd. properties. One of them was the Bousquet Complex. The Bousquet Complex is divided int

    Jan 1, 2000

  • CIM
    The Business Case for LHD Automation at Kidd Creek ? the World?s Deepest Base Metal Mine

    By Zachary Mayer

    Agenda ? Kidd Mine ? Background ? Problem & Opportunity ? Challenges associated to depth - Production Rates - Productive Work Time - Operational Delays - Transfer Levels - Mucking Time - Impa

    Aug 1, 2013

  • CIM
    Latest Development in Cathode Stripping Machines

    By M. Schmidt, P. Nord, M. Larinkari

    Cathode stripping machine technology has been developed significantly both in electrorefining (ER) and electrowinning (EW) applications in the last ten years. The main driver has been robotic cathode

    Jan 1, 2019

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988