Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Prediction of Morphology Development from Nucleation and Plating Overpotentials in Nickel Electrodeposition

    By Schoeman L., K. C. Sole

    Evaluation and measurement of the influence of changes in conditions and electrolyte composition during early stages of a growing metal electrodeposit are crucial to predict changes in developing morp

    Jan 1, 2017

  • CIM
    A Systematic Experimental Study on Gold Recovery from Electronic Waste Using Selective Ammonium Persulfate Oxidation (ABSTRACT)

    By Oberlando Gonzalez, Claudia Serna, Andrea Alzate, Esperanza López, Maria Holuszko

    This paper presents a systematic approach on gold recovery from electronic waste (e-waste) using ammonium persulfate. This process was developed as a response to the lack of hydrometallurgical systems

    Jan 1, 2017

  • CIM
    Acid Mine Drainage in the Iberian Pyrite Belt: Sources and Remediation Strategies

    By C. Ayora

    The Iberian Pyrite Belt (SW Spain and Portugal) contains one of the largest reserves of pyrite in the world with mining activities dating back to prehistoric times. About one hundred abandoned mine wa

    Aug 1, 2013

  • CIM
    Selection of Reagents Based on Surface Chemistry as Derived from Micro-FTIR Mapping of Coal Surface to Facilitate Selectivity in Coal Flotation

    By Maria D. Mastalerz, Wei Wang, Maria E. Holuszko, Amit Kumar

    In this study, the micro-FTIR analysis was used to investigate in-situ surface properties of coal and its components (macerals) and these were directly correlated to the coal hydrophobicity as measure

    Jan 1, 2017

  • CIM
    Fe(III)-As(V) Precipitates Obtained from the Fe(II)-As(V)-SO42--H2O System and Their Leaching Stability

    By Pingchao Ke, Zhihong Liu

    Fe(III)-As(V) precipitates were synthesized from the Fe(II)-As(V)-SO42--H2O system at 90°C in initial Fe(II)/As(V) molar ratios of 4.0 and 5.0, respectively. The synthesis were carried out by introduc

    Jan 1, 2017

  • CIM
    Ammonia Pressure Hydrometallurgy: Estimation of High Temperature Stability Constants for Metal Ammine Complexes

    By S. W. Asihene, K. Osseo-Asare

    The thermodynamic data necessary for the quantitative treatment of Metal-NH3- H2O systems at elevated temperatures are lacking in the literature. As a result discussions of the chemical basis of high

    Jan 1, 2004

  • CIM
    On Stream Analysis at Brenda Mines Limited Ten Years Experience with ARL's PCXQ X ray Analyser

    By Derek Perkins

    "Brenda Mines Ltd. operates an open pit copper and molybdenum mine located in south central British Columbia. The main economic mineralization is chalcopyrite and molybdenite. Pyrite, galena and sphal

    Jan 1, 1989

  • CIM
    Pervasive Sensor Network for Real Time Environmental Monitoring in Construction Sites

    By A. Carbonari

    In order to gain competitiveness and compete at a global level, construction companies should improve their efficiency. The problem is even more relevant in the construction field, whose work processe

    Aug 1, 2013

  • CIM
    Selective Leaching of Lead from a Lead-Silver-Zinc Concentrate with Hydrogen Peroxide in Citrate Solutions

    By G. T. Lapidus, R. Zárate-Gutiérrez

    Selective leaching of lead from a Pb-Ag-Zn concentrate with hydrogen peroxide in citrate solutions was studied at room temperature. Leaching tests were performed, varying the H2O2 concentration and th

    Jan 1, 2014

  • CIM
    Present Status of Canadian Energy

    By A. W. Lovett

    "THE last two years have been years of recession or, perhaps, years of marking time, depending upon whether the observer is a pessimist or an optimist. There has been a slackening in the industrial te

    Jan 1, 1959

  • CIM
    Use of Oxyfuel Based In-Plant Recycling Of Dust and Sludge

    By Joachim von Scheele

    An oxyfuel-based technology - OXYFINES - has been introduced for in-plant recycling. It provides fines, dust, sludge (without any drying-step) and other by-products arising in the steel and metal prod

    Jan 1, 2004

  • CIM
    Comparison for 6061 materials of extrusion analyses by FEM and by traditional methods

    By H. J. McQueen

    The modeling of the extrusion of 6061 alloy and its composites with 10 to 20 vol% Al203 or SiC by two techniques. The uniaxial finite element method FEM (DEFORM" ) provided force-stroke curves and tem

    Jan 1, 2004

  • CIM
    Control of Run-of-Mine Ore Quality at Sail Iron Ore Mines

    By Apoorva Bajaj

    Iron ore mines of Steel Authority of India Limited (SAIL) have to comply with strict chemical composition norms laid down for iron ore lumps supplied to its steel plants. This requires a careful plann

    Oct 1, 2009

  • CIM
    People, quality and processing improvement

    By L. M. Ame, W. D. Harwood

    "This paper outlines a management philosophy aimed at promoting employee involvement, quality and process improvement at Inco 's Thompson operations. It describes the use of statistical process c

    Jan 1, 1990

  • CIM
    Laboratory Flotation of Voisey's Bay Ovoid Zone Massive Sulphide

    By P. Lostritto, G. E. Agar, G. Labonte, M. Cherevaty

    "A locked cycle flotation test was done on a sample from the ovoid portion of the Voisey 's Bay copper-nickel sulphide ore. The chemical conditions for this test were generated by prior independent te

    Jan 1, 1998

  • CIM
    Nickel Recovery from Metallurgical Slags

    By S. C. Livanou, S. P. Tampouris, E. N. Zevgolis

    In ferronickel (Fe-Ni) production from oxidized nickeliferous ores, mechanical losses of ferronickel in the slag are reduced by magnetic separation. Slag from the electric furnaces (E/Fs) contains 0.1

    Jan 1, 2005

  • CIM
    Evaluation Of Crack And Simulated Corrosion Defects In An Api X-60 Gas Pipeline Steel

    By A. Hosseini

    Full-scale rupture tests were conducted on 508 mm (20 in) diameter API X-60 5.7 mm wall thickness pipes containing either axial semi-elliptical cracks or simulated corrosion defects with equivalent de

    Jan 1, 2010

  • CIM
    Automated Development of Construction Schedules Using Onsite Data Acquisition

    By Magdy Ibrahim

    Detailed as-built project schedules are necessary to close out construction projects, benchmarking, forecasting, dispute resolution, and improving cost estimates of future projects. Manual procedures

    Aug 1, 2013

  • CIM
    Gold Characterization of a Sample from Malartic East (Quebec) Using Concentration by Hydroseparator

    By L. J. Cabri

    A gold sample assaying 11.4 g Ault was selected for this study. Approximately 99% of the gold in this sample occurs as discrete gold minerals; the balance occurring as invisible gold in pyrite (determ

    Jan 1, 2005

  • CIM
    Hot gunning of TBRCs at Inco

    By P. M. Tyroler, W. J. Thoburn, M. R. Alberty

    "An initial test of this unique application demonstrated that hot gunned refractory would adhere satisfactorily. Subsequently, it was found that the proportion of material sticking during application

    Jan 1, 1981