Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development of Oxidation Resistant Titanium Alloys by Niobium Addition

    By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers

    The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li

    Jan 1, 2014

  • CIM
    Autoguided Vehicles in a Production Environment

    By Fabien Miller

    Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p

    May 1, 2002

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • CIM
    Material Balancing of Assays From on-Stream Analyzer

    By Claude Bazin

    "The On-Stream Analyzer has proven and is still proving to be an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilization

    Jan 1, 1995

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho Deposit

    By Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl

    The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b

    Jan 1, 2014

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    The Plant Audit (97ca6ee7-2dc9-4753-846d-b993abc1472c)

    By A. J. Neale, B. C. Flintoff

    "In most mineral processing operations the term audit is usually reserved for the exercise of checking financial records and/ or safety practices. While these activities are time consuming, no one dis

    Jan 1, 1991

  • CIM
    Suitability of PEM Fuelcells for Underground Mining Vehicles

    By Marc C. Bétournay

    Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a

    May 1, 2003

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    The Kumtor Gold Mill Start Up and Start up Challenges

    By John Kazakoff, Andrew Mortimore

    "Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the

    Jan 1, 1999

  • CIM
    Barrick?s Global Approach to Ground Control Management

    By J. Ran

    Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu

    May 1, 2006

  • CIM
    How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive Programs

    By A. Tylczak, C. Norman, C. Shook, S. Loif

    "There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m

    Jan 1, 2015

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    Flotation Improvements in the Luzenac Penhorwood Talc Concentrator

    By Ross Byron, Ken Roberts

    "During the fall of 2001 a program was initiated to determine the feasibility of improving the metallurgy in the flotation circuit at the Penhorwood Talc Concentrator located near Timmins, Ontario. Be

    Jan 1, 2004

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • CIM
    Content and Structure of a Plant Grinding Performance Management/Improvement System

    By K. Bartholomew

    The Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant processing performance impr

    Jan 1, 2015