Use of the Five Point Safety System Underground at Mount Isa Mines LimitedBy Moore R
An intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out
Jan 1, 1975
-
Process Selection and Design for the Palmarejo Silver MineSilver and gold bearing ore from the Palmarejo mine, located within the Mexican state of Chihuahua, contains a complex mix of electrum, native silver, silver sulfides and silver chlorides. This paper
Jan 1, 2009
-
Electrochemistry of Sulphide FlotationElectrochemical investigations of the flotation of sulphide minerals are re- viewed. Flotation with thiol collectors is interpreted in terms of a "mixed poten- tial" model in which the process leadi
Jan 1, 1984
-
Aerodynamic Studies of Shaft / Airway Intersection Losses and Mine Cage ResistanceBy Wilson PH
A research programme sponsored through the Australian Mineral Industries Research Association investigated two aspects of mine aerodynamics on model scale. These were aero- dynamic losses in (a) sh
Jan 1, 1978
-
Optimisation of Steam and Energy Usage in a Nickel RefineryThe nickel refinery at Yabulu consumes an average of 118,000 kg/h of low pressure steam in stripping operations to-recover ammonia and carbon dioxide from product liquor and ore tailings streams. The
Jan 1, 1985
-
Overcoming Mine Design and Production Challenges at the Sinclair Underground Nickel ProjectBy M J. Ireland, D P. Horne, S J. Simpson
The Sinclair Nickel Project, wholly owned by Xstrata Nickel Australasia (XNA), includes an underground mine, a concentrator, a village, an all-weather airstrip and associated mine infrastructure. The
Mar 26, 2012
-
On Testing Reducing MachineryMany of the discrepancies that appear when comparing the results of reducing machinery are due to the nature of the materials reduced and the conditions under which they have been treated. It is there
-
Addressing the Root Causes of Deviations in Reconciliation and Value TrackingBy W van der Westhuizen
Mining professionals recognise the need and application for reconciliation and value tracking. It is necessary however to examine our current reality, and evaluate the following. Do our reconciliation
Jan 1, 2002
-
Prefeasibility Studies and the Problems in their AuditingThere is considerable variability in the level of detail incorporated in prefeasibility studies relating to mining developments. Hence, when undertaking a review or audit, it is critical to attempt to
Jan 1, 1990
-
Geothermometry and Compositional Variation of Fluid Inclusions from the Tennant Creek Gold-Copper Deposits, Northern Territory, Implications for Exploration of Auriferous IronstonesBy Mernagh T, Large R. R, Ryan C. G, Huston D. L
The Tennant Creek goldfield is one of the largest gold producing districts in Australia, and major deposits, including Gecko, Juno, Orlando, Peko, Warrego, Nobles Nob, Golden Forty, Argo, TC 8 and
Jan 1, 1994
-
Opening Address (c74147d9-e807-4319-b483-6be99c947374)This is the seventh major symposium organised by Illawarra Branch over the past five years and the fifth dealing with various aspects of coal. It is clear that all of you here need no convincing that
Jan 1, 1975
-
Trends in the Study of the Physical Chemistry of SteelmakingThe history of the physical chemistry of steelmaking is reviewed through international conferences, and compared with the Japanese contribution. Subjects remaining to be solved are discussed. Seve
Jan 1, 1980
-
Process developments at Bouganville Copper LimitedThe original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla
Jan 1, 1986
-
Application of Clustering in the Analysis and Control of Mineral Processing PlantsBy Whiten W. J
The control of mineral processing plants incorporates a number of off-line and on-line actions by plant personnel to obtain satisfactory plant performance. In general, off-line actions centre around i
Jan 1, 1992
-
Treatment of Smelter Fume at the Electronic Refining and Smelting Company (ER&S), Port KemblaThe ER&S Company operates a copper sinter plant, blast furnace and converter smelting complex at Port Kembla. Eighty percent of the smelter feed is dirty copper concentrates that contain some lead
Jan 1, 1984
-
Planning for the Expected Amount of Variation to be AcceptableA good blending system is one that ensures that a plant can cope with the amount of grade variation that it will encounter. Prediction of amounts of variation that will be encountered on time or tonna
Mar 1, 2010
-
On-Line Cyanide Analysis and ControlCyanide is a significant contributor to the cost of producing gold. Any reduction in cyanide consumption that is achieved through more reliable measurement, and/or more efficient management of cyanide
Jan 1, 1997
-
The Geophysical Properties of Zinc DepositsBy Emerson D. W
The search for economic mineral deposits is becoming more difficult as exploration goes deeper in the established mining camps and spread out to the surrounding covered areas, which may have an `ov
Jan 1, 1993
-
Government Role in the Gold Mining Industry with Special Reference to a Gold TaxAustralia's gold mining industry has seen a resurgence in the past seven years - a resurgence the likes of which has been seen in very few, if any of this nation's other mineral industries.
Jan 1, 1986
-
Implementation Of BHA Computers Maintenance Management System At Kalgoorlie Nickel SmelterModern, high-output, continuous process plant requires heavy capital expenditure and is exroected to achieve a high rate of return upon the investment made, thus its high utilisation is an economi