Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Ventilation Network Optimisation Using MINOS

    By Wang Y. J

    This paper describes a more generalised or generic approach for the mine ventilation network problem. More specifically, it defines the network variables in a manner that establishes the network probl

    Jan 1, 1993

  • AUSIMM
    Rock Cuttings for Railways-Construction Methods and Geology

    Railway cuttings require the highest care in design and construction, as the pro- bability of failure concept does not allow any risks to be taken with hundreds of lives being dependent on continued

    Jan 1, 1979

  • AUSIMM
    Mathematical Modelling of the Coal Instantaneous Ash vs Density Curve

    By Gillies A. D S, Just G. D

    The advancement of computer applications in the coal industry is focusing interest on the presentation of washability data by mathematical functions.The normal method of presenting washability data is

    Jan 1, 1991

  • AUSIMM
    The Composition of Disseminated, Gold-bearing Sulfides within the Three-dimensional Framework of Bulk Au, As and Sb in the Globe-Progress Orogenic Gold Deposit, Reefton Goldfield, New Zealand

    By C McIntosh, M Carder, P M. J Durance

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Disseminated, gold-bearing sulfide minerals hosted in sheared, wall rock metasediments and

    Mar 18, 2015

  • AUSIMM
    Beyond Reconciliation ù A Proactive Approach to Using Mining Data

    Anyone who has driven backwards using only their rear view mirrors knows how difficult it is to avoid spinning the steering wheel the wrong way. So why run your mine that way? Traditionally Reconcilia

    Jan 1, 2003

  • AUSIMM
    Spoilpile Reclamation Trials at Callide Coal Mine of Thiess Bros.

    By Bell LC

    Overburden removal, mining and reclamation are now accepted as the basic operational steps involved in the winning of coal by open cut methods. To attain the lowest operational cost, the recontour

    Jan 1, 1978

  • AUSIMM
    Winding Rope Practice At The Zinc Corporation, Limited And New Broken Hill Consolidated Limited

    The importance of good winding rope practice is stressed. Details of the ropes used for various duties in the four shafts of The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Lim

    Jan 1, 1983

  • AUSIMM
    An Alternative to the Barrovian Interpretation? Evidence from Stratiform Ores

    Recent work has shown that, in at least some instances of regional metamorphism, metamorphic diffusion has been restricted to such relatively minute distances (of the order of 1.0 mm and much less), t

    Jan 1, 1982

  • AUSIMM
    Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited

    In line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting

    Jan 1, 1987

  • AUSIMM
    Development Wash/Screen Process to Beneficiate Christmas Island B-Grade Phosphates

    Christmas Island contains large deposits of phosphate minerals varying from high-grade calcium-phosphate (apatite) to lower grade iron and'aluminium phosphate (crandallite/millisite). The surfa

    Jan 1, 1971

  • AUSIMM
    Basic Mechanism of Strata Fractures Formation and Expansion Around Mine Working

    Underground measurements, observations and computed simulations, started a long time ago were concerning the study of : - occurence of typical rockburst, - inducing, stretching of main fractures in

    Jan 1, 1988

  • AUSIMM
    Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, Cobar

    The maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due

    Jan 1, 1969

  • AUSIMM
    Procedure and Example of Grade Control in Open Pit Mining

    Grade control plays an essential role in the good running of a mine. The factors at play are many, starting from a good analysis of the geology and a correct sampling procedure. Once this is achie

    Jan 1, 1987

  • AUSIMM
    The Interaction Between a Tunnel/Cavity and Nearby Structures

    By Abdalla MH

    The deformation resulting from the presence of a tunnel may signifcantly affected, nearby structures and need to be considered during design of both tunnel and structure. The aim of this paper is t

    Jan 1, 1987

  • AUSIMM
    Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt Conveyors

    On the 18th November, 19'58, the first coal was delivered to the Morwell Power Station from the adjacent Open Cut using conveyors for the transport of the coal from the working face to the boiler

    Jan 1, 1960

  • AUSIMM
    Mine Planning Succeeds on a Dedicated Minicomputer

    By McDonald E, Clifford PJ

    A mine planning system comprises all elements necessary to carry out the full range of mine planning activities from exploration to operations control. The application of computers as part of a mi

    Jan 1, 1983

  • AUSIMM
    Blair Anthol Coal Mine Project a Case History in Planning and Management

    By Maxwell HW

    Pacific Coal Pty Limited (a wholly owned subsidiary of CRA Limited) managed the interests of six members of a joint venture formed to mine and export eight million tonnes of export quality steamin

    Jan 1, 1986

  • AUSIMM
    How to Make (and Lose) Money in Minerals Exploration and Development in a Changing Environment

    Viking Holdings Ltd, a Todd Corporation company, is active in the mineral industry through operations, joint ventures and equity investments. Identification and management of risk is key to the succes

    Jan 1, 1997

  • AUSIMM
    Developing an Attractive Climate for Responsible Resource Development in a Socially-Sensitive Environment - The Victorian Experience as a Model

    By Jiricek F

    Legislative change has reformed the licensing process in Victoria. The Mineral Resources Development Act 1990 and the two stage system of licensing with the authority to commence work is discussed.

    Jan 1, 1997

  • AUSIMM
    Hoisting in Raise-Bored Shafts

    By Northcote GG

    There are many underground mines with shaft or decline access with limited production capacity or where the mine may become uneconomical as trucking costs escalate with increasing depth of the decl

    Jan 1, 1978