Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Extending the U5 in Berlin via a Shield Driven TunnelBy F Anthes, U Barow
Two tunnels are being bored using a æHydroshieldÆ in section 3.1 of the extension of the Underground railway line 5. At the end of the two tunnels, directly in front of the Hotel Adlon, the shields ca
Jan 1, 1999
-
Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnaceBy S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka
The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of
Jun 19, 2024
-
Rethinking variogram modellingBy A Boucher, M Baudin, P Androszczuk, I Minniakhmetov, A Rigby, P Machado, M Wright, B Van Dijken
IGO Ltd’s (IGO’s) Nova Operation (Nova), which is 160 km east-north-east of the town of Norseman in Western Australia (WA), mines and processes nickel-copper-cobalt (Ni-Cu-Co) sulfide ore from the mag
Mar 22, 2022
-
Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element DepositBy J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop
Mar 18, 2015
-
Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 KBy G H. Park, Y J. Jun, J H. Park
The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on
Jun 19, 2024
-
Risk, Responsibility, Return û Geotechnical Practice in MiningGeotechnical practice combines the site engineering geological model with engineering design and operations to control risk. The responsibility of the geotechnical professional is to present relevant
Jan 1, 2004
-
Blasthole Sampling for Grade Control - The Many Problems and SolutionsConventional blasthole sampling for grade control has acquired an extremely bad reputation for the last 50 years. The introduction of many sources of bias is a structural reality. Delimitation biases
Jan 1, 2008
-
Metallurgical Accounting Standards in Process PlantsMetallurgical accounting can be defined as the monitoring of the valuable metals from the time the ore is broken at the primary crusher until the time that we have the saleable products and residues.
Jan 1, 2009
-
Fluxing options and slag operating window for Metso’s DRI smelting furnaceBy K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye
Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace
Jun 19, 2024
-
Selective Flotation of Quartz and Feldspar Using Non-Ionic SurfactantBy M S. El Salmawy
In order to develop the HF-free flotation reagent system, the main objective of this investigation was to study the possibility of separation of quartz from feldspar using non-ionic surfactants as the
Jan 1, 2005
-
Filtration Test Work – Extracting the Whole Story for Studies and DesignBy G Bickert
Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a
Aug 8, 2011
-
Reviving the Inglewood Goldfield in Central Victoria û Exploration and OperationsThe Inglewood Gold Project consists of several titles in and around the Inglewood and Wedderburn Goldfields which were purchased from Strata Mining Corporation (now Excalibur Mining Corporation). The
Jan 1, 2008
-
Optimising Project Value and RobustnessBy W Stange, N Hanson
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
Geochemistry Contributing to the Rehabilitation of the Wismut Uranium Mines, GermanyBy Brown P. L
A study has been made of the geochemistry of the Ronneburg mine district as input to the overall management strategy for the rehabilitation of the mine site. The study drew on the geological data an
Jan 1, 1995
-
Developments in Processing to Match Future Mining OpportunitiesBy S La Brooy, C Fountain
Throughout its history the mining industry has focused on the highest-grade deposits sited in the most convenient locations. The burgeoning global population and higher standards of living not only in
Jan 1, 2008
-
Spontaneous combustion hazard assessment of McArthur River Mine waste rockBy P Marianelli, J Theiler, B Beamish, A Spillman
The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga
Jul 23, 2018
-
Retreatment of Junction North Tailing DumpIn the retreatment of an old tailing dump containing five per cent of lead principally as lead sulphate, the lead sulphate was floated with liquid Aerofloat reagent after sulphidising with phosphorous
Jan 1, 1956
-
Use of Large Twin-Power Scrapers in Prestrip Operations (5b96252c-a8e3-4454-b0d8-e41ea665d004)The use of scrapers in mining and earthmoving operations is not new; in fact they are one of the earliest methods of bulk earthmoving. A single machine, which can load, haul, and dump material with a
Jan 1, 2003
-
The Potential for Backfill in Highwall MiningBy G L. Boyd
Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research to
Jan 1, 1998
-
A Novel Approach for Control and Prevention of Acid Rock DrainageBy M Logsdon, T R. Clark, T I. Mudder
Oxidation of pyrite and other metal sulfides is accelerated by the activity of acidophilic iron- and sulfur-oxidising microorganisms. The ideal biocide for controlling biocatalysed acid rock drainage
Jan 1, 2003