Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Some Metallurgical Aspects of the Kidston Gold Mine

    By Plyley WF

    Kidston Gold Mine is a 3.5 million tonnes per year operation located 280 kilometres west of Townsville, Queensland. Kidston's ore body consists of 44.3 million tonnes graded at 1.79 grams per ton

    Jan 1, 1986

  • AUSIMM
    Simplifying the management of critical controls

    By C Young

    The identification of Critical Risks, their associated Critical Controls, and the implementation of processes to ensure their ongoing management can be difficult and resource intensive. Answering the

    May 5, 2022

  • AUSIMM
    The Solvent Extraction - Electrowinning Recovery of Zinc from Eskay Creek Pressure Oxidation Solutions Using Cyanex 302 Extractant

    By West-Sells P, King J. A, Patel C

    The Eskay Creek orebody is located in north-central British Columbia (Canada). The ore contains major gold and silver values and minor but economically significant quantities of zinc. The refractory

    Jan 1, 1993

  • AUSIMM
    Pilot Plant Studies in the Recovery of Copper from Copper-Lead Dross

    By Lewis IE

    Copper-lead dross is a by-product of the refining of lead bullion produced by the Imper- ial Smelting Process. This dross contains some 27 percent copper, 50 percent lead, four percent zinc and one

    Jan 1, 1975

  • AUSIMM
    Mine Dewatering - Bendigo Goldfield

    Historic mining across the Bendigo goldfield reached an average mining depth of 750 m over an area of about 16 km by 4 km, with two shafts exceeding 1400 m. Mining ceased in the mid 1900s due in part

    Jan 1, 2008

  • AUSIMM
    Developments in the measurement of stress in rock

    By I Gray

    Other than being reasonably certain of the average vertical stress being lithostatic, there can be little certainty about stress in the ground. The stresses and strains in rock are a function of gravi

    Nov 29, 2022

  • AUSIMM
    A generalised form of Gy’s equation for gold ores – empirical evidence

    By R C. A Minnitt

    The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the fundamental sampling error (FSE), the duplicate sampling analysis (DSA) and the segregation fractionalised

    May 9, 2017

  • AUSIMM
    Application of Infrared Spectral Data for Predictive Modelling of Alteration-Mineralisation Systems

    By S Pontual

    The use of spectral data has traditionally been for obtaining mineral information and for mapping out alteration systems. The output from these data is typically in the form of mineral assemblages and

    Aug 22, 2011

  • AUSIMM
    On-Line Measurement of Magnetic Susceptibility for Titanium Minerals Processing

    By P N. Holtham

    Magnetic separation is routinely used in the processing of titanium minerals, and the efficiency of these operations can be determined by measuring the magnetic properties of the process streams. The

    Jan 1, 2001

  • AUSIMM
    Exploration and Mining – The Need for Innovation

    By J F. H Thompson

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Mineral exploration and mining are challenging businesses. Remote and at times harsh condit

    Mar 18, 2015

  • AUSIMM
    Preassembly Concepts to Reduce Project Capital Costs

    By Kruse JW, Kjar AR

    Recently there has been increased recognition o'f the cost savings that can be achieved by the greater use of offsite preassembly for the construction of industrial plants. Preassembly is a me

    Jan 1, 1983

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Justification for Integrating Mechanical Sampling with Online Analysis

    By D W. Stevens

    Mechanical sampling provides a definitive value for the product sampled but the results are not instantaneous, meaning that decisions on process control can only be made hours after the sample is take

    Jul 29, 2014

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Gold-New Developments, Research, and the Future

    New technology is a significant factor in the present upsurge in world, and Australian, gold extraction and production. The main technologies in current use for gold production are described, ref

    Jan 1, 1986

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Water Resources Management in Iron Mining in the State of Minas Gerais (Brazil) and Some Benefits of an Automation System

    Water resources legislation in Brazil is evolving in a number ways. The nature of water resource ownership has changed in the last constitution (1988) so that now all water remains the property of the

    Jan 1, 2009

  • AUSIMM
    Planning & Design Of New Tailing Disposal Facilities At ZC/NBHC

    By Lean P. J

    The present The Zinc ODrporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) tailing dam (Site C) is expected to reach its terminal capacity late in 1985. Planning and design of ne

    Jan 1, 1983

  • AUSIMM
    The Cementation of Ag(I) Ions from Sodium Chloride Solutions onto Rotating Copper and Zinc Disks

    By Tran T

    The kinetics of cementation of silver chloro-complexes from sodium chloride solutions onto copper and zinc was studied using rotating disc electrode system. The activation energies were found to be

    Jan 1, 1992