Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Strategic and Tactical Geometallurgy – a Systematic Process to Add and Sustain Resource Value

    By N McKay, J Vann, W Ware, P Hodkiewicz, C Morley

    "Geometallurgy is now recognised within the mining industry as an approach that can both maximise value and reduce the risks associated with resource development. The process of spatial ore variabilit

    Jun 15, 2016

  • AUSIMM
    Water Management of the Mae Moh Project

    This paper presents the water management plan of the Mae Moh Project in the North of Thailand, which includes a large lignite opencast mine and thermal power plants. Lignite production will increase

    Jan 1, 1988

  • AUSIMM
    Viscosity evaluation of hot metal containing vanadium and titanium via a novel measurement technology and the thermodynamic analysis method

    By J Wen, P Hou, W Yu, M Hu, Z Jiang, C Bai

    Vanadium titano-magnetite (VTM) is one of the important iron ore resources in the world. High viscosity and low fluidity are the basic characteristics of hot metal containing vanadium and titanium dur

    Aug 21, 2024

  • AUSIMM
    Development of an acQuire Based Geotechnical Data Management System

    By V Pere

    A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio

    Aug 22, 2011

  • AUSIMM
    Effect of slag composition on titanium distribution ratio between ferrosilicon melt and CaO-SiO2-Al2O3 slag at 1773 K

    By J H. Park, M J. Lee

    Because the environmental problems are occurred by greenhouse gases such as CO2, the industries have tried to increase electric motor efficiency to reduce CO2 emissions. A core material of electric mo

    Jun 19, 2024

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    Case studies for integrating rehabilitation planning with mine planning in strip mining

    By I Neilsen, A Walker, A Hooper

    Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H

    Jul 25, 2018

  • AUSIMM
    Increasing stope recovery in an underground gold mine by using effective analysis, corrective action and employee engagement processes

    By R F. Cota, C Freeman, A Heberle

    "The Lamego mine is an underground gold mine in the Iron Ore Quadrangle in Minas Gerais state, Brazil. The mine produces 48 to 50 koz per annum, as part of the larger Cuiabá-Lamego Complex. This combi

    Oct 16, 2017

  • AUSIMM
    Exploration of the Porgera Gold Deposit

    The Porgera gold deposit in the Papua New Guinea highlands contains about 387 tonnes of gold. The results of its exploration show the benefits of persistence and commitment to this difficult depos

    Jan 1, 1987

  • AUSIMM
    æGarnieritesÆ of Goro, New Caledonia

    By E R. Ramanaidou, C Tessarolo, M Verrall

    Garnierite mineralogy in saprolitic ore of the Goro lateritic nickel deposit, New Caledonia , was investigated using X-ray diffraction (XRD), optical and scanning electron microscopy (SEM) and electro

    Jan 1, 2008

  • AUSIMM
    Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China

    By C Li, S Wang, L Qiao

    Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation

    Jan 1, 2000

  • AUSIMM
    Rehabilitation of the Ardlethan Tin N.L. Concentrator

    The Ardlethan tin concentrator had dete riorated considerably in metallurgical per- formance, maintenance and plant availability. This problem was compounded by low tin prices and International Tin

    Jan 1, 1978

  • AUSIMM
    Application of Atomic Absorption Specthophotometry

    In Mount Isa voltage and frequency fluctuations caused. by haulage shaft operation gave considerable difficulties with the initial application of Atomic Absorption Spectro-photometry.The methods used

    Jan 1, 1963

  • AUSIMM
    The Simulation of Flotation Banks and Circuits

    By J J. Cilliers

    The aim of this paper is to give an overview of the FrothSim flotation simulator and to demonstrate its ability to predict the performance of real flotation circuits. Example simulations are presented

    Jan 1, 2005

  • AUSIMM
    The Physical Structure of Cast Iron and Its Relation to Cupola Practice

    IT is very difficult for a founder engaged in jobbing work, comprising all sizes and classes of castings, to appreciate that the analysis of the iron he is using cannot entirely fill the situation he

    Jan 1, 1926

  • AUSIMM
    Underground Downhole Geophysics at CSA Mine, Cobar

    By Erickson M. E, Smith C. K, Carswell J. T

    Thirteen holes totalling 3200m were surveyed using a downhole time domain Geonics EM37 system at the 830 metre level within the CSA Mine, Cobar, New South Wales, in order to search for blind, electric

    Jan 1, 1990

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Bauxite Mining with a Mobile Crusher and Overland Conveyors at Pinjarra, Western Australia

    Alcoa of Australia's Del Park mining op eration is centred 9 km. east of the Pinjarra alumina refinery, and is centrally locatedwith- in the 10, 000 sq. km. lease which the Company holds for ba

    Jan 1, 1973