Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Using technology to support best practice for tailings storage facilities (TSF) management, governance and disclosure

    By H Arvidson, A Walker, N Pollock

    Following the recent tailings tragedy in Brumadinho, the Investor Mining and Tailings Safety Initiative was formed representing institutional investors in the mining industry. This Initiative, led by

    Jul 1, 2021

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • AUSIMM
    Monitoring Sb in lead refining using advanced techniques in Industry 4.0

    By S Zummar, A Van den Bulck, T De Staercke, T Van Rompaey

    An increase of 22 per cent in lead usage is expected in the European Union by 2050. During lead refining, the Harris process is a critical step in which a salt melt is used to remove arsenic, tin and

    Aug 21, 2024

  • AUSIMM
    Water balance management 101

    By M Rafty, C Lane

    Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the

    Jul 23, 2018

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Are there differences in size distribution when comparing conventional crushing and HPGR?

    By I Ritchie, G Lane, C Morley, D Yataco

    Marcobre SAC (Marcobre) is developing the Mina Justa project in Peru. The project has a lower grade oxide orebody overlaying the higher grade sulfide orebody. The oxide ore is treated by acid leaching

    Sep 11, 2017

  • AUSIMM
    Maximising resource utilisation in South Africa – the BIF story

    By A Singh, C Da Corte

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m

    Nov 8, 2021

  • AUSIMM
    Implications of the Carbon Price and Developing a Carbon Strategy

    By P Holt, M Allen

    On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa

    Nov 20, 2012

  • AUSIMM
    Potential and limitations for sensor-based particle sorting of gold ores – experiences on sensor-based particle sorting piloted for SAG pebbles

    By A Kobzev, C Robben

    Sensor-based particle sorting of gold ores is the masterclass of preconcentration. The technical challenges of a grade in ppm scale makes a direct detection with currently available technology in mill

    Nov 10, 2020

  • AUSIMM
    Kinetics of Collector Adsorption on Mineral Surfaces

    By A Holmgren, W Forsling

    In the present study infrared attenuated total reflection (IR-ATR) was used to monitor the rate of in situ adsorption of heptyl xanthate on a layer of zinc sulfide synthesised on a germanium ATR cryst

    Jan 1, 2005

  • AUSIMM
    Designing Flotation Circuits for High Fines Recovery

    By D C. Curry, M F. Young

    Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir

    Jan 1, 2005

  • AUSIMM
    Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in Japan

    By D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki

    "Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of

    Nov 5, 2014

  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    Public reporting – new standards or no standards?

    By J Coombes, R Sterk

    The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating

    Sep 20, 2017

  • AUSIMM
    Geological Setting of Eliwana and Flying Fish Deposits along the North Limb of the Brockman Syncline, Hamersley Province, Western Australia

    By S Robinson, R Perkins, D Barrett, D Kepert, C Fowers

    The discovery and delineation of significant mineralisation in the Eliwana region continues Fortescue Metals Group’s strong exploration success. In the decade after the first hole was drilled into Chr

    Jul 13, 2015

  • AUSIMM
    Recent Process Improvements at Hidden Valley Gold Mine

    By F Burns, G Peachey

    The Hidden Valley process plant has recently undertaken a program to relieve process flow bottlenecks and improve process automation. An environment of cost reduction and restrained capital necessitat

    Sep 1, 2014

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.

    By W. M. LONIE

    Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc

    Jan 1, 1979

  • AUSIMM
    A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value Terms

    By H J. J Boshoff, A J. Karrasch

    Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t

    Jun 28, 2016

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk Factors

    By M Szwec, P Corbett, P Sheffield

    Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place

    Nov 5, 2014